My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULA MEETING AGENDA PACKET _Revised_ 6-2-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
060226 REGULAR
>
CITY COUNCIL REGULA MEETING AGENDA PACKET _Revised_ 6-2-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2026 2:56:22 PM
Creation date
5/29/2026 2:52:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
617
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2306 <br />Page 31 of 35 <br />Page 31 of 35 <br /> <br /> <br />104.103. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping <br />shall be installed as shown on the approved building permit set and shall be inspected <br />and approved by the Landscape Architecture Division. <br /> <br />105.104. CONCRETE CURBS: 6-inch vertical concrete curbs, with curb cuts or flush curbs <br />with wheel stops, if determined to be acceptable by the Director of Engineering/City <br />Engineer and Director of Community Development, shall be installed between all paved <br />and landscape areas, in conformance with the City’s Standard Specifications and <br />Details. <br /> <br />106.105. EROSION CONTROL: For purposes of erosion control, the project developer <br />shall plant a hydro seed mixture designed by the project developer’s landscape <br />architect and approved by the Landscape Architecture Division prior to installation. The <br />erosion control shall be maintained by the project developer until permanent <br />landscaping is in place. <br /> <br />107.106. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention <br />devices and above ground irrigation controls shall be located and screened to minimize <br />their visual impacts. These devices with their proposed screening shall be shown on the <br />landscaping and utility plans submitted with the building permit plans or improvement <br />plans and shall be subject to the review and approval of the City Landscape Architect <br />prior to their installation. If above-ground, they shall be painted forest green or an <br />equivalent dark-green color. Screens shall consist of berms, walls, or landscaping <br />satisfactorily integrated into the landscape plan. Landscape screens shall include <br />shrubbery designed by species and planting density to establish a complete screen <br />within 1 year from the date of planting. Weather protection devices, such as measures <br />to protect pipes from freezing, shall require approval by the City Landscape Architect <br />prior to use; at no time shall fabric or other material not designed and/or intended for <br />this purpose be wrapped around or otherwise placed on these devices. Project <br />Specific Condition. <br /> <br />108.107. MAINTENANCE: The project developer and all future owners of the property <br />shall, at no expense to the City, maintain all the landscaped areas related to the project <br />in a healthful, attractive and reasonably weed-free manner consistent with the approved <br />landscape plan, for the duration of the existence of the project. <br /> <br />109.108. SITE LIGHTING: All site lighting shall be designed for consistency with the <br />International Dark-Sky Association’s (IDA) Model Lighting Ordinance. This project site <br />shall be considered to be in an LZ-1 zone for design purposes. Lighting shall be subject <br />to review and approval by the City Landscape Architect prior to building permit <br />issuance. Project Specific Condition. <br /> <br />Trees <br /> <br />Page 54 of 617
The URL can be used to link to this page
Your browser does not support the video tag.