My WebLink
|
Help
|
About
|
Sign Out
WILSON GENERAL CONTRACTING, INC. (#2026523)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WILSON GENERAL CONTRACTING, INC. (#2026523)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2026 11:30:21 AM
Creation date
6/1/2026 11:26:37 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
New
NAME
WILSON GENERAL CONTRACTING, INC.
Contract Record Series
704-05
Munis Contract #
2026523
Contract Expiration
12/31/2026
NOTES
GENERAL CONTRACTOR SERVICE @ STATION NO. 5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From:David Luera <br />To:Dan Villasenor <br />Cc:Steve Castaneda; Tatiana Baragan; Lauren Snashall <br />Subject:Subject: Fire Station #5 – Temporary Equipment Storage Structure (VersaTube) – Contractor Selection <br />Date:Monday, April 6, 2026 9:16:04 AM <br />Attachments:Outlook-bbi1s2gu.png <br />Outlook-xfk0vu0r <br />FPINC Bid Proposal Fire Station 5.pdf <br />Proposal Fire Station 5.pdf <br />Invitation to Bid Fire Station #5 Temporary Storage Structure (VersaTube).msg <br />Fire Station 5 Proposal - GRC Electric.pdf <br />Outlook-ufrh3sxq.png <br />Outlook-ocbeex3l <br />Dan – <br />Good morning. <br />Project Title: Fire Station #5 – Temporary Equipment Storage Structure <br />Location: 1200 Machado Place, Pleasanton, CA <br />On March 24, 2026, the City issued a request for proposals for the installation of a prefabricated <br />VersaTube metal building at Fire Station #5. The scope included site preparation, framing, <br />anchoring, siding/roofing installation, and installation of a roll-up door and commercial access <br />door. <br />Following the proposal due date of April 3, 2026, we received three responsive quotes from <br />qualified contractors: <br />Wilson General Contracting Inc.: $44,890.00 <br />GRC Electric: $55,200.00 <br />FPINC General Contracting: $60,432.00 <br />DC Construction: No Quote provided. <br />Each proposal was reviewed for completeness, scope alignment, and conformance with the <br />project requirements. Wilson General Contracting Inc. provided the lowest responsive and <br />responsible quote and demonstrated a clear understanding of the project scope, including <br />structural installation, anchoring, siding, roofing, and door installation components. <br />Given the project timeline and need to protect critical Fire equipment, we recommend <br />proceeding with Wilson General Contracting Inc. for this project. <br />Funding for this project has been identified in the current fiscal year budget under: <br />440105 – 515 R&R Fund (FY 25/26) <br />Please advise on the next steps so we can move forward with procurement and scheduling. <br />Docusign Envelope ID: 28533DFB-8675-8793-83AC-54FA0C9BB6FA
The URL can be used to link to this page
Your browser does not support the video tag.