9 <br /> <br />o Manufacturer requirements <br />x Correct any deficiencies identified by the City <br />2.10 Site Cleanup and Closeout <br />The Contractor shall: <br />x Remove all debris and materials <br />x Maintain a clean and safe job site <br />x Conduct final walkthrough with City staff <br /> <br /> <br />3. EXCLUSIONS <br />Unless otherwise specified: <br />x Utilities (electrical, plumbing, fire systems) <br />x Major grading or earthwork <br />x Concrete slab replacement <br />x Permit fees (unless directed by City) <br /> <br /> <br />4. PROJECT SCHEDULE <br />Construction shall be completed within approximately 3–4 weeks from Notice to Proceed. <br /> <br /> <br />5. ACCEPTANCE <br />All work is subject to inspection and acceptance by the City of Pleasanton. <br /> <br />Docusign Envelope ID: 28533DFB-8675-8793-83AC-54FA0C9BB6FA