My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGLAR MEETING AGENDA PACKET 6-16-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
061626 REGULAR
>
CITY COUNCIL REGLAR MEETING AGENDA PACKET 6-16-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2026 4:49:11 PM
Creation date
6/9/2026 4:46:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br />Item #14 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />June 16, 2026 <br />Public Works - Engineering Division <br /> <br />TITLE: APPROVE PLANS AND SPECIAL PROVISIONS, AND AUTHORIZE THE CITY <br />MANAGER TO ENTER INTO AN AGREEMENT WITH FRONTLINE GENERAL <br />ENGINEERING, INC., IN THE AMOUNT OF $284,951 FOR THE SASSAFRAS <br />COURT STORM DRAIN INTERCEPTOR PROJECT, CIP NO. 22484; AND <br />AUTHORIZE THE DIRECTOR OF PUBLIC WORKS TO APPROVE AND <br />EXECUTE CONTRACT CHANGE ORDERS FROM A PROJECT CONTINGENCY <br />NOT TO EXCEED $44,843 <br /> <br />SUMMARY <br />The Sassafras Court Storm Drain Interceptor Project will install a vault to capture and hold <br />creek debris before stormwater enters the public pipe network on Oak Tree Farm Drive. The <br />vault will be constructed within an easement with sufficient operating area to allow the City’s <br />maintenance equipment to remove accumulated debris, such as tree branches and sediment, <br />for disposal. Clearing debris from this location has historically been burdensome for <br />Operations staff within Public Works. <br /> <br />A competitive bidding process was conducted in accordance with the City’s Procurement and <br />Contracting Procedures. Five bids were received. Frontline Engineering, Inc., submitted the <br />lowest responsive bid. Staff recommends the City Council authorize the City Manager to <br />execute a construction contract with Frontline Engineering, Inc., in the amount of $284,951, <br />and authorize a project contingency not-to-exceed $44,843, for a total authorized construction <br />budget of $329,794, not including construction support services. <br /> <br />RECOMMENDATION <br />1. Approve plans and special provisions for the Sassafras Court Storm Drain Interceptor <br />Project, CIP No. 22484; <br />2. Authorize the City Manager to enter into a construction contract with Frontline <br />Engineering, Inc., for the low bid amount of $284,951; and <br />3. Authorize the Director of Public Works to approve and execute contract change orders <br />from a project contingency not-to-exceed $44,843 or approximately 15 percent of the <br />contract amount. <br /> <br /> <br />BACKGROUND <br />Severe winter storms from December 2022 through March 2023 caused damage throughout <br />Pleasanton due to flooding, downed trees, power outages, and property damage. <br /> <br />The Sassafras Court neighborhood off of Oak Tree Farm Drive experienced damage during <br />the 2023 storm events similar to earlier damage in 2017. The hillside west of the neighborhood <br />channels stormwater into a creek that carries woody debris and silt downstream where the <br />Page 186 of 443
The URL can be used to link to this page
Your browser does not support the video tag.