My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGLAR MEETING AGENDA PACKET 6-16-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
061626 REGULAR
>
CITY COUNCIL REGLAR MEETING AGENDA PACKET 6-16-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2026 4:49:11 PM
Creation date
6/9/2026 4:46:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 4 <br />Item #5 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />June 16, 2026 <br />Community and Economic Development <br /> <br />TITLE: APPROVE AND AUTHORIZE THE CITY MANAGER TO EXECUTE A DESIGN <br />PROFESSIONAL SERVICES AGREEMENT WITH KIER AND WRIGHT CIVIL <br />ENGINEERS AND SURVEYORS, INC., IN THE AMOUNT OF $925,411 FOR THE <br />DEVELOPMENT, EVALUATION, AND CREATION OF A PRECISE ROADWAY <br />ALIGNMENT FOR EL CHARRO ROAD (CIP 27501), AND APPROVE THE <br />RELATED BUDGET AMENDMENTS <br /> <br />SUMMARY <br />El Charro Road is an important north-south transportation corridor within Pleasanton and the <br />broader Tri-Valley area. Completion of the segment between Stoneridge Drive and Stanley <br />Boulevard as a public roadway has long-range implications for circulation, safety, multimodal <br />connectivity, and access to adjacent development. The Precise Roadway Alignment Project <br />will develop a technically defensible, precise roadway alignment that can serve as the basis for <br />future project development, evaluating and incorporating elements including utility <br />infrastructure, drainage, constructibility, cost, and environmental constraints. The agreement <br />with Kier and Wright will be for an amount not to exceed $925,411. <br /> <br />RECOMMENDATION <br />Staff recommends the City Council approve and authorize the City Manager to execute the <br />Design Professional Services Agreement with Kier and Wright Civil Engineers and Surveyors, <br />Inc., in the amount of $927,618, and approve budget amendments to transfer $925,411 from <br />the Tri-Valley Transportation Development Fee Reserve, CIP No. 01541, to the El Charro <br />Road Precise Roadway Alignment Project, CIP No. 27501 (21430124-440108-27501) in the <br />Tri-Valley Transportation Development Fund (Fund 214). <br /> <br />BACKGROUND <br />The segment of El Charro Road between Stoneridge Drive and Stanley Boulevard is a key <br />missing link in Pleasanton’s circulation network, one that has been long-identified in the City's <br />General Plan, and needed to support well-managed growth in East Pleasanton. A precise <br />roadway alignment and alternative routing analysis are essential to define a safe, efficient, <br />multimodal, and buildable solution for El Charro that enables further environmental analysis, <br />right-of-way planning, and capital allocation. <br /> <br />This process was recognized as an essential element of the prior East Pleasanton Specific <br />Plan process. Establishment of the El Charro Roadway alignment through the specific plan <br />process would have allowed evaluation of design alternatives before the design and submittal <br />of development projects. With the halt of the East Pleasanton Specific Plan and subsequent <br />project applications in the East Pleasanton area, both within and outside the existing City <br />limits, it is critical that the City evaluate and identify the precise alignment of El Charro Road so <br />that developments in East Pleasanton can plan for and around its location. This project will <br />allow the City to move forward with East Pleasanton projects, ensuring that the location of El <br />Page 56 of 443
The URL can be used to link to this page
Your browser does not support the video tag.