My WebLink
|
Help
|
About
|
Sign Out
RES 2026043
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 10:32:43 AM
Creation date
6/10/2026 11:47:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES NO. 2026-043
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
emeari <br /> City of Pleasanton I Water Shortage Contingency Plan PLF:-\`. NTO\ <br /> The City uses planned unconstrained water demands as input to the AWSDA for the current year and the <br /> following one dry year. Unconstrained water demands are customer demands where no water <br /> conservation measures are in effect. In planning for water demands, the City considers the following <br /> factors, as applicable and appropriate: <br /> 1. Weather conditions <br /> 2. Water year type <br /> 3. Population changes (e.g., due to development projects) <br /> 4. Anticipated new demands (e.g., changes to land use) <br /> 5. Pending policy changes that may impact demands <br /> 6. Infrastructure operations <br /> Similarly, when describing water demands for the AWSDA, the City generally uses Section 4 (Water Use <br /> Characterization)of the 2025 UWMP, including the demand projections. If the demand projections differ <br /> between the AWSDA and the UWMP,the City provides an explanation for the difference. <br /> In preparing the AWSDA, Pleasanton uses the following assessment methodology and criteria to evaluate <br /> the City's water supply reliability for the current year and following one dry year. <br /> • The City uses a spreadsheet to plan for current year and future year supply and demands. <br /> Planned supply and demand inputs are entered into the spreadsheet in annual increments. As <br /> needed,the increments may be revised to monthly or seasonal periods to more closely evaluate <br /> specific conditions and needs. <br /> • Supply and demand are compared to determine the City's water supply reliability in the current <br /> year and the following one dry year.The City's water supply is deemed reliable if it can meet <br /> planned water demands in both the current year and the following dry year. If water supply <br /> cannot meet planned water demands in the current year or the following dry year,the extent of <br /> the water shortage condition is determined, and the City prepares response actions in <br /> accordance with this WSCP. <br /> • Findings from the AWSDA are presented to City Council for consideration, along with <br /> recommendations for action. <br /> 3 SIX STANDARD WATER SHORTAGE LEVELS <br /> To provide a consistent regional and statewide approach for conveying the relative severity of water <br /> supply shortage conditions, the State has established six standard water shortage levels that correspond <br /> to progressive reductions of up to 10, 20, 30, 40, 50%, and greater than 50%from the normal reliability <br /> condition. Each shortage condition should correspond to additional actions water suppliers would <br /> implement to meet the severity of the impending shortages. <br /> A water supplier may use its own shortage levels if a crosswalk is included relating its existing shortage <br /> levels to the six standard levels; however, the City's stages align with the State's, as described in PMC <br /> §9.30.060 and as indicated in Table 3. <br /> eki environment <br /> &water 6 Public Draft I May 2026 <br /> EKI Environment&Water, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.