Laserfiche WebLink
eftliger <br /> City of Pleasanton i Water Shortage Contingency Plan rL£ASANTON <br /> Table 3.Cross-reference for Standard vs.Supplier Shortage Levels(DWR Table 8-1) <br /> Check the box if the Supplier uses the Standard six levels of <br /> water shortage. Proceed to the next table. <br /> Standard Shortage Percent Shortage Supplier's Shortage Percent <br /> Levels Range Levels Shortage Range <br /> 1 Up to 10% 1 Up to 10% <br /> 2 Up to 20% 2 Up to 20% <br /> 3 Up to 30% 3 Up to 30% <br /> 4 Up to 40% 4 Up to 40% <br /> 5 Up to 50% 5 Up to 50% <br /> 6 >50% 6 >50% <br /> PMC Chapter 9.30 includes stages that call for voluntary and/or mandatory water conservation to"reduce <br /> the consumption of water over an extended period of time, thereby extending the available water <br /> required for the city's customers while reducing the hardship to the greatest extent possible on or to the <br /> city and on or to the general public."Stages of action are dependent on the total amount of water supplied <br /> to the city by Zone 7 and the amount of water the City can pump out of the groundwater basin from its <br /> own wells. <br /> 4 SHORTAGE RESPONSE ACTIONS <br /> CWC §10632 (a)(4) requires shortage response actions that align with the defined shortage levels. <br /> Pleasanton's shortage response actions consist of a combination of demand reduction, supply <br /> augmentation, and operational changes.The specific suite of response actions implemented depends on <br /> the event that precipitates a water shortage stage,the time of the year the event occurs,the water supply <br /> sources available, and the condition of the City's water system infrastructure. For each response action, <br /> the City has estimated the extent to which the action will reduce the gap between supply and demand. <br /> The City tracks progress toward water use reduction goals during drought by comparing monthly water <br /> production for the same month in the most recent non-drought year to obtain a percent reduction. The <br /> City will increase or decrease its public outreach efforts based on observed use reduction. The City <br /> considers shortage response actions as tools for responding to water shortage conditions. <br /> 4.1 Supply Augmentation <br /> The City's normal supply portfolio remains purchased treated water from Zone 7 and local groundwater. <br /> During shortages, the City coordinates with Zone 7 on supply conditions and under extreme shortage <br /> conditions, may request to expand its GPQ from Zone 7, as indicated in Table 4. <br /> Ienvironment Public Draft I May 2026 <br /> &watoer 7 EKI Environment&Water, Inc. <br />