Laserfiche WebLink
<br />Energy Services Agreement 14 04/21/2026 <br />7. Hold post-site walk meeting(s) with Staff to summarize site assessment <br />findings and clarify priorities <br />8. Create inventory spreadsheets, field notes, a picture database cataloging <br />relevant infrastructure data such as age, size, manufacturer, model/serial <br />numbers, condition, efficiency ratings, operating procedures and <br />maintenance needs <br />9. Create a needs matrix showing total Citywide infrastructure needs for <br />efficiency, renewables, and other improvements, gain input from key <br />stakeholders to validate priorities and establish hierarchy of needs <br />10. Prepare a set of unmarked aerial maps or pictures for sites eligible to <br />receive renewable energy measures and obtain mock -ups of desired <br />locations from key stakeholders <br />11. Obtain funding plan parameters from Finance and CITY leaders including <br />desired funding options to be explored from state, federal, local, and private <br />sector programs as well as budgeting solutions for City capital or operating <br />funds <br />12. Prepare an outreach and participation plan to incorporate community <br />feedback into the PA development and conduct outreach to the Pleasanton <br />community <br />Preliminary Development <br />1. Propose infrastructure modernizations and efficiency improvements <br />including optimization, adjustment, retro-commissioning, retrofit, upgrade, <br />redesign, installation, replacement and/or further evaluation for energy, <br />gas and water infrastructure needs <br />2. Evaluate the City’s Climate Action Plan (CAP) and recommend strategies <br />to accomplish its objectives <br />3. Propose solutions citywide for EV charging infrastructure needs <br />4. Propose projects that minimize financial and technical risks to CITY <br />5. Develop a preliminary scope of work matrix showing proposed measures at <br />applicable CITY locations, phased implementation options, and proposed <br />layouts for renewables <br />6. Provide a not-to-exceed turnkey price, lifecycle savings, and funding <br />source options based on preliminary engineering estimates; prepare <br />sample funding scenarios as examples for use by CITY leadership, <br />Finance Department and/or Municipal Advisor to select a recommended <br />funding plan for Staff and Council consideration <br />7. Based upon PA findings and Staff input, prepare PA report for the Program <br />draft concept, including: utility baseline summary, general overview of <br />existing conditions by scope category, scope of work matrix, bulleted scope <br />summary, aerial layouts, financial highlights, sample funding plan options, <br />PowerPoint presentation, timeline estimates, memos and staff reports <br />8. Attend and present the Program PA report to applicable stakeholder <br />groups, Public Boards, Planning Commission, and CITY Council to gain <br />input on preliminary Program <br /> <br />Docusign Envelope ID: 2FACAA06-C000-8E3B-8363-DD2D556A0D51Docusign Envelope ID: 8C132635-A597-8F5D-8082-3EB7B8AE19BF