My WebLink
|
Help
|
About
|
Sign Out
CLIMATEC, LLC
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
C
>
CLIMATEC, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2026 4:42:45 PM
Creation date
6/12/2026 4:42:20 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Other
Contract Type
New
NAME
CLIMATEC, LLC
Contract Record Series
704-05
Munis Contract #
N/A
Contract Expiration
12/31/2029
NOTES
CITYWIDE ENEERGY INFRASTRUCTURE MODERNIZATION PROGRAM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Energy Services Agreement 15 04/21/2026 <br />9. Confirm desired Program to be implemented by ESCO and set target <br />action date for Council approval based on validated input from Council, City <br />Manager, Public Works, Finance, City Attorney, Utilities, Engineering, <br />Community Development, appropriate department leaders, and other key <br />stakeholders <br /> <br />Detailed Assessment (DA) <br />After review of the PA, Staff and Council shall provide direction on the scope of work <br />and funding options it desires to pursue for implementation and set a target date for <br />Council action. In good faith, ESCO will complete the DA at its own risk, without <br />financial obligation of CITY, to finalize the Program for anticipated implementation. <br />During the DA, ESCO will conduct in-depth engineering site assessments to finalize <br />the desired Program including detailed scope of work, technical specifications, not -to- <br />exceed price, and savings estimates. ESCO will prepare backup analysis, breakouts, <br />and other data as needed for Staff to analyze the final Program details, as well as <br />detailed financial proforma for Finance and City leadership to solidify the funding plan. <br />To support Staff’s final due diligence process, ESCO will provide extensive resources <br />to ensure scope details, technical specifications, financial analysis, Agreement terms <br />and timelines serve CITY’s best interest. DA services and deliverables shall include (in <br />sequence) but may not be limited to: <br />1. Conduct in-depth engineering site assessments to finalize Program scope, <br />including review of existing conditions including electrical and structural <br />requirements, validating inventories, specifying equipment, and detailing <br />the scope of work to be performed <br />2. Communicate and coordinate with various local, state, and federal <br />permitting authorities necessary to evaluate regulatory issues and Program <br />constraints <br />3. Finalize strategies for converting municipal fleet to zero -emission or <br />alternative fuel vehicles clarifying scope of work to be performed by ESCO <br />versus work to be performed by others and identify alternative funding <br />solutions <br />4. Update the scope of work matrix with proposed final scope and prepare <br />summary of modifications that occurred between PA and DA for Staff <br />review <br />5. Perform detailed financial engineering to finalize Program scope and <br />funding plan including final not to exceed turnkey price, detailed savings <br />and other analysis as needed <br />6. Prepare Program implementation plan, including specific tasks, who <br />performs those tasks, and an estimated timeline for Program completion <br />7. Subject to Staff approval of the final Program, prepare Agreement <br />amendment to implement the Program for City Attorney review <br />8. Provide final Program by revising previously provided PA report to reflect <br />the final DA scope of work and funding plan <br />9. Present DA report to appropriate stakeholder groups and CouncilAssist <br />Staff with preparation of agenda items and Government Code Section 4217 <br />requirements to seek Council approval for Program implementation <br />10. <br /> <br />Docusign Envelope ID: 2FACAA06-C000-8E3B-8363-DD2D556A0D51Docusign Envelope ID: 8C132635-A597-8F5D-8082-3EB7B8AE19BF
The URL can be used to link to this page
Your browser does not support the video tag.