My WebLink
|
Help
|
About
|
Sign Out
CLIMATEC, LLC
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
C
>
CLIMATEC, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2026 4:42:45 PM
Creation date
6/12/2026 4:42:20 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Other
Contract Type
New
NAME
CLIMATEC, LLC
Contract Record Series
704-05
Munis Contract #
N/A
Contract Expiration
12/31/2029
NOTES
CITYWIDE ENEERGY INFRASTRUCTURE MODERNIZATION PROGRAM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Energy Services Agreement 4 04/21/2026 <br />obtain the PTO (Permission to Operate) from the City’s utility. The monitoring equipment provider <br />will provide monitoring hosting services for the first five years of operation. City warrants that they <br />hold title to the installation site and agree to the solar installation on that site. <br /> Terms applicable to the solar scope are as follows: <br /> <br /> a. Interconnection Agreement – means an agreement between the City and a particular utility <br />involved for interconnection of the solar output to the electrical grid. <br /> <br /> b. Interconnection Equipment – all equipment (including wiring and conduit and metering for net <br />metering) on the City side of the main service meter to enable proper interconnection of the solar <br />system to the grid. <br /> <br /> Design – Subject to Council approving Program Implementation, ESCO will complete final <br />elements of design and engineering such as land surveys, geotechnical studies and preparation of <br />design documents and drawings required to prepare submittal packages, obtain permits and <br />procure equipment. ESCO shall prepare the design submittals (prepared by qualified individuals). <br />The submittal shall be submitted to City for approval. City shall provide approvals within fifteen <br />business days from receipt. The ESCO shall not proceed with work until approval is granted by the <br />City. <br /> <br /> Unforeseen Site Conditions – Within 10 business days of discovery, ESCO will notify City in <br />writing of (a) subsurface or latent physical conditions at the site differing materially from those <br />described in any contract or City documentation that will affect the price of delivery of the Work. <br />Should such conditions arise, the City will have several options to consider, including identifying <br />an alternative location for the affected scope (e.g. moving Solar PV array) or removing the scope. <br /> <br />9. INVOICING & PAYMENTS. ESCO may invoice the City for any equipment and/or materials <br />installed at a job site. City shall have no obligation to pay for equipment or supplies unless and <br />until unconditional releases from all suppliers of the same have been provided to the City. Except <br />for amounts in dispute, the City agrees to pay ESCO amounts invoiced upon receipt of invoice for <br />completion of Work. Except for amounts in dispute, City shall retain 5% from all payments as <br />retention in accordance with Public Co ntract Code Section 7107. Final Payment, including <br />retention withheld, will be due in accordance with Public Contract Code 7107, or as otherwise <br />provided by law. If ESCO’s undisputed invoice is not paid within 30 days of its receipt, it is <br />delinquent and ESCO may add one percent (1%) per month interest onto delinquent amounts. <br /> <br />10. SUBCONTRACTORS. ESCO shall submit to the City in writing a list of any subcontractors <br />engaged by the ESCO for any Work for the City’s prior written approval, not to be unreasonably <br />withheld. ESCO agrees to bind every subcontractor by the terms of this Contract, including, <br />without limitation, indemnification, insurance, business license and warranty requirements. ESCO <br />shall be fully responsible to City for the Work of its subcontractors and persons directly or <br />indirectly employed by them. The Contract shall not create any contractual relationship between <br />any subcontractor and City. <br /> <br /> ESCO and all subcontractors performing the work shall not employ any person who is unfit or <br />unskilled in assigned Work. ESCO and/or subcontractor shall dismiss any person whom City <br />deems incompetent or unfit <br /> <br />11. MATERIALS. All materials shall be new, in compliance with all applicable laws and codes, and <br />shall be covered by a manufacturer’s warranty, if appropriate. If the materials or equipment <br />included in this Agreement become temporarily unavailable, the ESCO shall immediately notify the <br />City in writing of the unavailability and the time for performance of the Work shall be extended to <br />the extent thereof with the City’s written consent. In the case of permanent unavailability, ESCO <br />Docusign Envelope ID: 2FACAA06-C000-8E3B-8363-DD2D556A0D51Docusign Envelope ID: 8C132635-A597-8F5D-8082-3EB7B8AE19BF
The URL can be used to link to this page
Your browser does not support the video tag.