My WebLink
|
Help
|
About
|
Sign Out
ORD 2306
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2301 - 2400
>
ORD 2306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 4:20:57 PM
Creation date
6/15/2026 3:45:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 CC-2026-__, May 19, 2026 <br />11 of 36 <br />mechanical equipment, whether on the structure, on the ground, or on the roof, with <br />materials architecturally compatible with the building. Screening details shall be shown <br />on the plans submitted for building permit, the adequacy of which shall be determined <br />by the Director of Community and Economic Development. All required screening shall <br />be installed prior to final occupancy. <br />20. RECYCLING AND COMPOSTING PROGRAMS: The project shall comply with the <br />current City/Pleasanton Garbage Service recycling and composting programs. <br />East Bay Regional Park District (EBRPD) <br />21. The plans shall be revised to show and include exit spikes for the staging area. <br />The exist spikes shall meet the specifications <br />found here:https://www.ebparks.org/sites/default/files/410-Controlled-Vehicle-Entry- <br />20211011.pdf, and shall be subject to the review and approval of EBRPD staff prior <br />to building permit issuance for the development. Project Specific Condition. <br />22. The project developer shall complete the staging area and trail access prior to issuance <br />of occupancy of the 11th home in the subdivision. The project developer shall provide <br />bi-weekly check-ins with EBRPD staff prior to and during construction of the staging <br />area and trail.Project Specific Condition. <br />23. The project developer shall work directly with EBRPD staff to establish a long-term <br />funding mechanism to cover expenditures for maintenance of the staging area, trail, and <br />dedicated open space for fire, public safety, and operational needs. If a conservation <br />easement is required, the resource agencies will require an endowment be established <br />to provide for its long-term maintenance and stewardship of protected resources. The <br />funding mechanism shall be completed prior to issuance of building permits. Project <br />Specific Condition. <br />Environmental <br />24. MITIGATION MEASURES / IMPLEMENTATION MEASURES: As identified in the <br />project’s Environmental Impact Report (EIR), Findings of Fact (FOF), and Mitigation <br />Monitoring and Reporting Program (MMRP), implementation of mitigation measures is <br />required to reduce environmental impacts to the extent feasible. The adopted mitigation <br />measures applicable to the Project include, but are not limited to, those related to Air <br />Quality, Biological Resources, Cultural Resources, Geology/Soils, Hydrology/Water <br />Quality, Noise, Transportation, and Utilities. <br />All mitigation measures identified in the certified EIR and adopted MMRP shall be fully <br />implemented by the developer. These measures shall be incorporated into all applicable <br />improvement plans, grading plans, building plans, and construction documents, and <br />shall be subject to review and approval by the applicable City departments/divisions <br />prior to issuance of grading or building permits, as specified in the MMRP.
The URL can be used to link to this page
Your browser does not support the video tag.