Laserfiche WebLink
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 CC-2026-__, May 19, 2026 <br />11 of 36 <br />mechanical equipment, whether on the structure, on the ground, or on the roof, with <br />materials architecturally compatible with the building. Screening details shall be shown <br />on the plans submitted for building permit, the adequacy of which shall be determined <br />by the Director of Community and Economic Development. All required screening shall <br />be installed prior to final occupancy. <br />20. RECYCLING AND COMPOSTING PROGRAMS: The project shall comply with the <br />current City/Pleasanton Garbage Service recycling and composting programs. <br />East Bay Regional Park District (EBRPD) <br />21. The plans shall be revised to show and include exit spikes for the staging area. <br />The exist spikes shall meet the specifications <br />found here:https://www.ebparks.org/sites/default/files/410-Controlled-Vehicle-Entry- <br />20211011.pdf, and shall be subject to the review and approval of EBRPD staff prior <br />to building permit issuance for the development. Project Specific Condition. <br />22. The project developer shall complete the staging area and trail access prior to issuance <br />of occupancy of the 11th home in the subdivision. The project developer shall provide <br />bi-weekly check-ins with EBRPD staff prior to and during construction of the staging <br />area and trail.Project Specific Condition. <br />23. The project developer shall work directly with EBRPD staff to establish a long-term <br />funding mechanism to cover expenditures for maintenance of the staging area, trail, and <br />dedicated open space for fire, public safety, and operational needs. If a conservation <br />easement is required, the resource agencies will require an endowment be established <br />to provide for its long-term maintenance and stewardship of protected resources. The <br />funding mechanism shall be completed prior to issuance of building permits. Project <br />Specific Condition. <br />Environmental <br />24. MITIGATION MEASURES / IMPLEMENTATION MEASURES: As identified in the <br />project’s Environmental Impact Report (EIR), Findings of Fact (FOF), and Mitigation <br />Monitoring and Reporting Program (MMRP), implementation of mitigation measures is <br />required to reduce environmental impacts to the extent feasible. The adopted mitigation <br />measures applicable to the Project include, but are not limited to, those related to Air <br />Quality, Biological Resources, Cultural Resources, Geology/Soils, Hydrology/Water <br />Quality, Noise, Transportation, and Utilities. <br />All mitigation measures identified in the certified EIR and adopted MMRP shall be fully <br />implemented by the developer. These measures shall be incorporated into all applicable <br />improvement plans, grading plans, building plans, and construction documents, and <br />shall be subject to review and approval by the applicable City departments/divisions <br />prior to issuance of grading or building permits, as specified in the MMRP.