My WebLink
|
Help
|
About
|
Sign Out
ORD 2306
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2301 - 2400
>
ORD 2306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 4:20:57 PM
Creation date
6/15/2026 3:45:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 CC-2026-__, May 19, 2026 <br />12 of 36 <br />Ongoing Monitoring and Enforcement: All mitigation measures shall be monitored in <br />accordance with the adopted MMRP. The project developer shall be responsible for all <br />costs associated with implementation, monitoring, and reporting. The developer shall <br />create and provide a mitigation measures checklist indicating all mitigation measures <br />have been satisfied, incorporated into the building permit plans or improvements plans, <br />and/or addressed. Said checklist shall be incorporated as one of the first four plan <br />sheets of all building permit and engineering permit plan submittals for review by the <br />City prior to issuance of permits Compliance shall be verified by the City prior to <br />issuance of applicable permits and throughout construction and operation, as specified. <br />Project Specific Condition. <br />Green Building and Sustainability Measures <br />25. Climate Action Plan 2.0 Compliance: Prior to building permit issuance, a Greenhouse <br />Gas (GHG) Emission Compliance Checklist shall be provided, to the Planning Division <br />for review and approval by the Director of Community and Economic Development. The <br />measures shall be shown on the building permit plans submitted to the Building and <br />Safety Division. The Checklist shall include notation indicating the sheet(s) the measure <br />can be found. Prior to building permit final, all of the measures indicated on the <br />approved checklist shall be inspected and approved by the City of Pleasanton. <br />Construction Practices and Noticing <br />26. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br />material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8 a.m. to 5 p.m., Monday through Saturday. No construction shall be allowed on State <br />or Federal Holidays or Sundays. The Director of Community and Economic <br />Development may allow earlier “start times” or later “stop times” for specific construction <br />activities, e.g., concrete pouring. All construction equipment shall meet Department of <br />Motor Vehicles (DMV) noise standards and shall be equipped with muffling devices. <br />Prior to construction, the hours of construction shall be posted on site. <br />27. OVERNIGHT CONSTRUCTION PARKING: Campers, trailers, motor homes, or any <br />other similar vehicle are not allowed on the construction site except when needed as <br />sleeping quarters for a security guard subject to receipt of a temporary conditional use <br />permit (per PMC § 18.116.010.E). <br />28. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on <br />the project site for daily administration/coordination purposes during the construction <br />period. <br />29. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The project developer shall <br />prepare a construction and parking management plan to address impacts and parking <br />demands during the construction phase of the project. The construction and parking
The URL can be used to link to this page
Your browser does not support the video tag.