Laserfiche WebLink
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 CC-2026-__, May 19, 2026 <br />13 of 36 <br />management plan shall be subject to review and approval by the City Traffic Engineer <br />and Director of Community and Economic Development prior to issuance of a <br />demolition permit, or the first building permit, whichever comes first. The following items <br />shall be incorporated into the construction and parking management plan: <br />a. Show truck route for construction and delivery trucks that does not include <br />neighborhood residential streets, unless approved by the City Traffic <br />Engineer; <br />b. Show construction vehicles and equipment parking area, materials storage, <br />temporary fencing, construction trailer location, and construction <br />contractors/workers parking area; and <br />c. Sidewalk closure or narrowing is not allowed during on-site construction <br />activities without prior approval by the City. <br />30. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the <br />project site and shall be emptied to prevent odor. <br />31. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off- <br />hauled from the site and disposed of in a lawful manner. No temporary stockpiling of dirt <br />on this site shall occur without specific review and approval by the Director of <br />Community and Economic Development. <br />32. NOTICE OF CONSTRUCTION: Prior to construction, the project developer shall notify <br />the owners and occupants within the Canyon Creek and Canyon Meadows <br />subdivisions, and the owners and occupants of 1102, 11056, and 11078 Dublin Canyon <br />Road of the construction schedule in writing. Such notice shall include contact names <br />and numbers for the developer and contractor. Project Specific Condition. <br />33. DISTURBANCE COORDINATOR: The project developer shall designate a “disturbance <br />coordinator” who shall be responsible for responding to any complaints regarding <br />construction noise, dust, construction parking, etc. The coordinator (who may be an <br />employee of the general contractor) shall determine the cause of the complaint and <br />shall require the implementation of reasonable measures warranted to correct the <br />problem. A telephone number of the disturbance coordinator shall be posted on the <br />construction site fence and on the notification sent to neighbors. The sign shall also list <br />an emergency after-hours contact number for the disturbance coordinator, or designee. <br />34. CULTURAL RESOURCES/HUMAN REMAINS: If any prehistoric or historic artifacts, or <br />other indication of cultural resources are found once the project construction is <br />underway, all work shall stop within 20-meters (66 feet) of the find. A qualified <br />archaeologist shall be consulted for an immediate evaluation of the find prior to <br />resuming groundbreaking construction activities within 20 meters of the find. If the find <br />is determined to be an important archaeological resource, the resource shall be either