My WebLink
|
Help
|
About
|
Sign Out
ORD 2306
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2301 - 2400
>
ORD 2306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 4:20:57 PM
Creation date
6/15/2026 3:45:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 CC-2026-__, May 19, 2026 <br />34 of 36 <br />Project Specific Condition. <br />111. TREE DISPOSITION PLAN: Provide a tree disposition plan that shows trees to remain, <br />trees to be removed, the value of each tree, the total value of the trees to remain and be <br />protected, and the total value of trees to be removed. The plan shall also include the <br />tree protection recommendations from the arborist report.Project Specific Condition. <br />112. TREE BOND: Any tree affected by development/construction must be protected per the <br />Municipal Code. The project developer shall post cash, letter of credit, or other security <br />satisfactory to the Director of Engineering/City Engineer, for all Heritage Trees and any <br />other significant tree as deemed by the City Landscape Architect. This bond or security <br />will be for the value of the tree(s), up to a maximum of $200,000, and shall be held for a <br />minimum of 1 year following acceptance of public improvements or completion of <br />construction, whichever is later, and shall be forfeited if the trees are destroyed or <br />substantially damaged. An arborist shall be onsite during any tree work (i.e. root <br />pruning, trimming, setting up tree protection, etc.). The bond or security may be <br />released early with a certification letter by the arborist confirming he/she was present <br />during said tree work and work was performed in accordance with the arborist’s <br />recommendations.Project Specific Condition. <br />113. ROOT CONTROL BARRIER: The project developer shall provide root control barriers <br />and 4-inch perforated pipe for all trees located within 8 feet of pavement or other <br />hardscape, determined by the City Landscape Architect. Root barriers shall be located <br />along the edge of the pavement wherever the tree is within 8 feet of pavement or <br />hardscape. Information and details shall be included in the landscape plan submittal for <br />review and approval by the Landscape Architecture Division. <br />114. TREE PRUNING: Pruning shall be conducted by a certified arborist familiar with the <br />International Society of Arboriculture (ISA) pruning guidelines and shall comply with the <br />guidelines established by the ISA, Tree Pruning Guidelines, current edition, to maintain <br />the health of the trees. <br />115. TREE PROTECTION FENCING: Prior to issuance of a grading or building permit, the <br />project developer shall install temporary 6-foot-tall chain-link fencing (or other fence <br />type acceptable to the Landscape Architecture Division) outside of the existing tree drip <br />lines. The location of the tree protection fencing shall be shown on the demolition plans <br />(if applicable), grading, building, and/or landscape plans. The fencing shall remain in <br />place until final landscape inspection by the Landscape Architecture Division. Removal <br />of such fencing prior to approval may result in a “stop work order.”
The URL can be used to link to this page
Your browser does not support the video tag.