Laserfiche WebLink
Page 28 <br /> The City of Pleasanton owns and maintains a storm drainage system along the <br /> border of the Maintenance District. This system serves to prevent flooding and <br /> associated damage to the Improvements, and manage urban runoff including local <br /> pollutants loading from the Improvements. The contribution from the City of <br /> Pleasanton toward general benefit from the maintenance, rehabilitation, and <br /> replacement of the local storm drainage system is conservatively estimated to be <br /> 10%, based upon the relative cost to construct and maintain this critical local <br /> infrastructure. In other words, if the Maintenance District were required to <br /> construct and maintain the local storm drainage system, the budget would <br /> increase by at least 10%. <br /> The City of Pleasanton owns and maintains local public streets throughout the <br /> Maintenance District.These public streets provide access to the Improvements for <br /> its enjoyment as well as efficient maintenance. The contribution from the City of <br /> Pleasanton toward general benefit from the maintenance, rehabilitation, and <br /> replacement of the local public streets is conservatively estimated to be 10%, <br /> based upon the relative cost to construct and maintain this critical local <br /> infrastructure. In other words, if the Maintenance District were required to <br /> construct and maintain the local public streets, the budget would increase by at <br /> least 10%. <br /> The value of the initial Improvements constructed by the Developer can be <br /> quantified and monetized as an annuity to be amortized. Since the initial <br /> Improvements were performed and paid for by non-assessment funds, this <br /> "annuity" can be used to offset general benefit costs, and is conservatively <br /> estimated to contribute 20%. In other words, if the Maintenance District were <br /> required to construct all the Improvements, the annual budget would increase by <br /> at least 20%. <br /> In other words,there is a 19.6%contribution needed to offset the general benefits <br /> conferred by the Improvements, and there is a 50% contribution from City of <br /> Pleasanton supporting local infrastructure, along with the amortized value of <br /> initial construction. This 50% contribution more than satisfies the general benefit <br /> requirements. <br /> City of Pleasanton <br /> Lighting & Landscape Maintenance District No. 1994-1, SCIConsultingGroup <br /> Oak Tree Farm <br /> Engineer's Report <br />