Laserfiche WebLink
Total number of hours for each Project activity. EXAMPLE: 16 DUI Saturation Patrols. 160 Total hours x $100 an <br />hour (highest hourly rate) = Total cost $16,000. Sergeant OT rate with benefits $80-$100 per hour, Officer OT rate <br />with benefits $60-$80 per hour. NOTE: If engaging in CTFGP grant-funded Saturation Patrols, DUI Checkpoints, or <br />other enforcement activities in areas where the applicant does not have primary traffic jurisdiction, the applicant <br />should consult with the agency having primary traffic jurisdiction. NOTE: The number of activities listed for each <br />Budget line item must match the number of activities listed in the Performance Measures. <br />DUI Checkpoint <br />One (1) DUI checkpoint will be conducted during the project performance period (December 2026). This grant- <br />funded activity will require overtime compensation, inclusive of wages and benefits, for personnel directly assigned <br />to the operation. Classifications assigned include Police Officers (15), Police Sergeants (2), Police Lieutenant (1), <br />Streets Department personnel (2), and Community Service Officers (2). Overtime rates with benefits are as follows: <br />Officer $121.80 per hour, Sergeant $158.40 per hour, Lieutenant $170.90 per hour, Streets Personnel $78.20 per <br />hour, and CSO $72.30 per hour. Each employee will work a 10-hour shift, totaling 220 combined personnel hours for <br />the checkpoint. Total personnel cost for this single project activity is $25,857.00. All services will occur within the <br />Project Performance Period, and no full-salary positions are requested. <br />Equipment <br />Costs may include non-expendable, tangible, personal property having a normal useful life of more than one year, <br />and an acquisition cost of at least $5,000 (ex: four identical assets, which cost $1,250 each, for a total of $5,000, are <br />not considered an equipment purchase). Equipment shall be directly related and necessary to complete CTFGP <br />grant-funded DUI/DUID enforcement, checkpoint, and education Project activities taking place in the Applicant’s <br />jurisdiction (ex: message board for DUI checkpoints). Equipment should be purchased at the beginning of the <br />Project Performance Period. To be eligible for reimbursement, Equipment must be purchased and received within <br />the Project Performance Period. Itemize separate Budget line items for each Equipment item. If requesting outfitting, <br />include outfitting in the total cost of the vehicle. Any equipment or items permanently affixed to the vehicle are <br />considered/classified as outfitting (ex: lights, sirens, decals, prisoner cage). Items such as flashlights, cones, signs <br />and computers are not considered vehicle outfitting. The requestor shall only request to outfit the vehicle with the <br />standard equipment similar to the rest of their vehicle fleet. Please refer to Annex A of the Request for Application <br />(RFA) for ineligible expenses. For EACH Budget line item, the narrative shall include: * Description of equipment <br />item * Quantity * Unit cost * Outfitting cost, if applicable * Total cost * Correlating CTFGP activity. EXAMPLE: <br />DUI/DUID Enforcement Patrol Vehicle 1@ $80,000 + Outfitting $40,000 = $120,000 for Checkpoint and DUI/DUID <br />Saturation Patrols NOTE: The number of activities listed for each Budget line item must match the number of <br />activities listed in the Performance Measures. <br />Checkpoint Equipment <br />The Pleasanton Police Department is requesting two (2) Generac MLT6SKDS-STD3 diesel LED light towers at <br />$12,780 per unit, plus tax, delivery, and contingency, for a total cost of $45,755.86, and eight (8) LifeLock <br />Preliminary Alcohol Screening (PAS) devices at $646 per unit, including supporting software, calibration, tax, <br />shipping, and contingency, for a total cost of $9,457.96. Both equipment items are non-expendable assets with a <br />useful life exceeding one year and will be purchased and received at the beginning of the Project Performance <br />Period. The light towers are directly necessary to safely conduct the one (1) CTFGP-funded DUI checkpoint by <br />providing full illumination of the screening area, enhancing officer safety and proper impairment detection. The PAS <br />devices, equipped with integrated tracking software, will support DUI enforcement by enabling accurate roadside <br />alcohol screening and documenting usage data for quarterly reporting. These equipment requests directly correlate <br />to the single DUI checkpoint activity listed in the performance measures and are essential to successfully completing <br />the project. <br />Other Direct Costs <br />Costs may include operational costs. Other Direct Costs shall be directly related and necessary to complete CTFGP <br />grant-funded activities included in the Project. Other Direct Costs should be purchased at the beginning of the <br />Project Performance Period to ensure they are utilized when completing corresponding Project activities. To be <br />eligible for reimbursement, Other Direct Costs must be purchased and received within the Project Performance <br />Period. Itemize separate Budget line items for each Other Direct Costs item. For EACH Budget line item, the <br />narrative shall include: * Name/description of Other Direct Costs * Quantity * Unit cost * Total cost * Correlating <br />CTFGP activity. EXAMPLE: Large Traffic Cones. 75 @ $40 each = $3,000 for Checkpoints NOTE: The number of <br />activities listed for each Budget line item must match the number of activities listed in the Performance Measures. <br />Page 21 of 22 <br />Pleasanton Police Department <br />Pleasanton Police Department <br />Attachment 1 <br />Page 45 of 214