My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETTIMG AGENDA PACKET 7-7-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
070726 REGULAR
>
CITY COUNCIL REGULAR MEETTIMG AGENDA PACKET 7-7-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 11:54:14 AM
Creation date
7/2/2026 11:51:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/7/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />a.to Contractor from a source other <br />Quota. <br />b. <br />for the Livermore Valley Groundwater Basin, as that document may be <br />updated or amended from time to time by the Board, or any subsequent <br />Groundwater Sustainability Plan adopted under the SGMA for the <br />management of the Livermore Valley Groundwater Basin. <br />c. <br />Control and Water Conservation District. <br />d.n obtaining groundwater from the Main <br />Basin by pumping or any other means, from wells, shafts, tunnels, <br />excavations or other sources of such groundwater, for domestic, municipal, <br />irrigation, industrial or other use. <br />e. "Groundwater Pumping Quota" shall mean that quantity of water <br />that the Contractor is entitled to extract from the Main Basin without paying a <br />recharge fee to Zone 7. GPQ is calculated based on the historic Safe Yield of <br />the Main Basin. <br />f. "In-Lieu Treated Water" shall mean that quantity of treated water delivered <br />from Zone 7 in exchange for an equal reduction in Contractor's extraction of <br />its Groundwater Pumping Quota. <br />g. "Main Basin" shall have the same meaning as that term is defined in the <br />Alternative GSP, and shall include both upper and lower aquifers of the Main <br />Basin. The Main Basin is depicted in greater detail in Exhibit A. <br />h. <br />midnight) water volume a Contractor has demand for over a given interval <br />(i.e. weekly, monthly, yearly). <br />i.Municipal & Industrial shall include <br />Contractor or any other party to a similar wholesale M&I Contract with Zone <br />7. <br />j. "Municipal & Industrial Water Supply" shall mean a supply of water from Zone <br />7 to each M&I Contractor regardless of the source of said water or <br />Contractor's end use of that supply. <br />k.shall mean the quantity of water that can be successfully <br />extracted from the Main Basin on an annual basis over an extended number <br />of years without reducing groundwater storage. Such safe yield is the net <br />quantity of groundwater added to the Main Basin by stream percolation <br />(including percolation from stream releases required for prior water rights), <br />rainfall percolation, applied irrigation water percolation, and net subsurface <br />inflow.Safe Yield does not include imported water. The Safe Yield for the <br />Page 57 of 214
The URL can be used to link to this page
Your browser does not support the video tag.