Laserfiche WebLink
3 <br />Main Basin was estimated at approximately 13,400 acre-feet per year in <br />2021. <br />l. <br />Water Code § 10721(w), and calculated as set forth in the Alternative GSP. <br />m. "Treated Water" shall mean water that is processed as necessary to comply <br />with drinking water requirements of the California State Water Resources <br />Control Board Division of Drinking Water, the United States Environmental <br />Protection Agency and other agencies with pertinent regulatory authority. <br />n. "Turnout Facilities" shall mean Zone 7 facilities required to provide treated <br />water deliveries from Zone 7's water system to the Contractor's water <br />system. See Exhibit B for a schematic of a typical turnout facility. <br />2. Term of Contract <br />This contract shall become fully effective as of the date indicated above, and shall <br />continue until December 31, 2055 unless earlier terminated or extended by written <br />agreement of the Parties. <br />3. Communication <br />Zone 7 shall endeavor to communicate with its M&I Contractors on an ongoing basis to <br />inform M&I Contractors of updates to policies and procedures which may be of interest <br />to M&I Contractors and solicit input as appropriate. <br />B. WATER SERVICE <br />4. <br />defined in Exhibit C, attached hereto and incorporated. Exhibit C may be amended by <br />the written agreement of the Parties which agreement shall not be unreasonably <br />withheld, conditioned, or delayed. Provided that any change in Contractor Service Area <br />may separately be subject to the requirements of the Local Agency Formation <br />Commission, Public Utility Commission or other agency having authority to set service <br />areas. Any future areas outside Zone 7 boundaries to be served by Contractor which <br />receive water from sources other than Zone 7 or the Main Basin shall not be considered <br />part of the Contractor's Service Area under the terms of this contract. Contractor may <br />not add additional areas to its Service Area that are <br />boundaries except upon a finding of the Board that providing water to that area is in <br />the best interests of Zone 7. <br />Notwithstanding the foregoing, Contractor may request Zone 7 written permission to <br />provide temporary/construction water service to users outside of its Service Area, or <br />Page 58 of 214