Laserfiche WebLink
7 <br />practices. Results of this testing and adjustments (if any) made to the meter and <br />associated instrumentation shall be provided promptly to Contractor. The <br />Contractor shall have the right to be represented by a qualified observer during <br />any instrumentation and/or meter tests and/or verification. <br />c) <br />. The testing <br />shall be consistent with standard methods recommended by the meter <br />manufacturer, or other methods consistent with industry practices, as agreed <br />upon by the Contractor and Zone 7. In the event testing demonstrates an error <br />exceeding 2%, the expenses of the test will be assumed by Zone 7. <br />11. Delivery Schedule of Municipal & Industrial Water <br />Contractor shall submit a preliminary water delivery schedule annually on a form <br />provided by Zone 7. This preliminary water delivery schedule will include: (1) an <br />Groundwater Pumping Quota required by Contractor for the succeeding 5 calendar <br />years, set out on a monthly basis; and (2) the anticipated Maximum Day Treated Water <br />Demand from Zone 7 for each such year. <br />approve the schedule or make such revisions as may, in the judgment of Zone 7, be <br />necessary to make deliveries to Contractor. <br />Zone 7 will use its best To the <br />delivery schedule for an amount not less than the amount of water set forth in that <br />C Zone 7 shall identify the <br />reason for any revisions or disapproval of Contractor's delivery request. Zone 7 shall <br />n <br />Sections 7, 12, 13, and 14. <br />12. Operational Requirements <br />simultaneously, and peak deliveries may be curtailed or unintentionally reduced from <br />time to time in response to limitations in system capacity. Zone 7 may at its sole <br />discretion elect to regulate flows, provided, however, that so long as water and Zone 7 <br />system capacity are available, Zone 7 will endeavor to meet all reasonable demands for <br />peak deliveries and will use reasonable diligence to provide a regular and uninterrupted <br />supply of water from its turnout facilities. Zone 7 shall communicate its actions to <br />regulate or reduce flows to the Contractors as soon as reasonably practicable. <br />Page 62 of 214