My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETTIMG AGENDA PACKET 7-7-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
070726 REGULAR
>
CITY COUNCIL REGULAR MEETTIMG AGENDA PACKET 7-7-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 11:54:14 AM
Creation date
7/2/2026 11:51:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/7/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />13. Temporary Curtailment of Delivery <br />Zone 7 will make all reasonable efforts to provide continuous service to Contractor but <br />may schedule to temporarily discontinue or reduce the delivery of water to Contractor <br />for the purpose of necessary investigation, inspection, maintenance, repair or <br />replacement of any of the facilities necessary for the delivery of treated water to <br />Contractor. <br />Zone 7 shall notify Contractor as far in advance as possible of any scheduled <br />discontinuance or reduction and the estimated duration of such discontinuance or <br />reduction, and shall use its best efforts to avoid disruptions in service to Contractor. <br />In the event of any discontinuance or reduction in delivery of water, Contractor may <br />elect to reschedule the water otherwise identified for delivery in the approved water <br />delivery schedule, subject to the availability of system capacity and considering the <br />approved delivery schedules of all other M&I Contractors. <br />14. Suspension of Service <br />In the event that Contractor shall be delinquent in the payment for water for more than <br />90 days after the due date (as said due date is defined in Section 32), such delinquency <br />shall be called to the attention of the Board for resolution. The Board may, in its <br />discretion and after giving Contractor an opportunity to be heard, order the suspension <br />or reduction of service to Contractor. <br />C. TURNOUT DESIGN & CONSTRUCTION <br />15. Requests for Turnout Facilities <br />Requests for additional turnout facilities are subject to review and approval by Zone 7. <br />Prior to the design or construction of a turnout facility, Contractor shall deposit with <br />Zone 7 an amount of money estimated by Zone 7 to cover all costs to be incurred by <br />Zone 7 for that design or construction. Such costs include but are not limited to design, <br />engineering, design review, construction, right-of-way acquisition, inspection, <br />costs may be included in the monthly invoices provided to Contractor pursuant to <br />Section 32. <br />Following the completion of the design or construction of the turnout facility, Zone 7 will <br />provide Contractor with an accounting of the actual costs incurred by Zone 7 in the <br />completion of that design or construction. The deposit shall be applied to the actual costs <br />incurred by Zone 7, and the appropriate refund or invoicing to Contractor will be made. <br />Contractor shall make payment; or Zone 7 shall issue a refund on any excess remaining <br />submission of said statement. Contractor shall have <br />the right to audit the records of Zone 7 for the purpose of verifying actual costs. <br />Page 63 of 214
The URL can be used to link to this page
Your browser does not support the video tag.