My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETTIMG AGENDA PACKET 7-7-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
070726 REGULAR
>
CITY COUNCIL REGULAR MEETTIMG AGENDA PACKET 7-7-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 11:54:14 AM
Creation date
7/2/2026 11:51:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/7/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 5 <br />Item #5 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />July 7, 2026 <br />Public Works - Utilities Division <br /> <br />TITLE: RECEIVE AN UPDATE ON ANNUAL REVIEW OF THE CITY'S SEWER SYSTEM <br />MANAGEMENT PLAN FOR CALENDAR YEAR 2025 <br /> <br />SUMMARY <br />State Water Resources Control Board (SWRCB) General Order WQ 2022-0103-DWQ requires <br />the City to maintain a Sewer System Management Plan (SSMP) to properly manage, operate, <br />and maintain its sewer system; reduce and prevent spills; and contain and mitigate spills that <br />do occur. The City’s current SSMP was adopted by Council on June 17, 2025, and certified to <br />the SWRCB on July 24, 2025. <br /> <br />Element 9 of the SSMP indicates that the City will annually review the SSMP for effectiveness, <br />make changes to improve program implementation, and report key performance indicators to <br />the City Council. This agenda report provides the City Council with an update on the City’s <br />annual review of its SSMP for calendar year 2025. <br /> <br />RECOMMENDATION <br />Receive an update on the annual review of the City’s Sewer System Management Plan for <br />calendar year 2025. <br /> <br />BACKGROUND <br />The City owns and operates a sewer collection system consisting of approximately 253 miles <br />of gravity sewers, 4.9 miles of force mains, eight siphons, 11 active pump stations, and <br />approximately 21,000 service connections. Average dry-weather flow is approximately 6 million <br />gallons per day (MGD). The City has agreements with Dublin San Ramon Services District <br />(DSRSD) and the City of Livermore, for the Ruby Hill service area, for wastewater treatment <br />and is a member of the Livermore-Amador Valley Water Management Agency (LAVWMA) for <br />treated wastewater disposal. The City also has agreements with Alameda County that allow <br />sewage flows from their Castlewood Service Area to be transported through the City’s <br />collection system for treatment at DSRSD. <br /> <br />Pursuant to State Water Resources Control Board (SWRCB) General Order WQ 2022-0103- <br />DWQ, the City is required to maintain a Sewer System Management Plan (SSMP). The City’s <br />current SSMP was adopted by the City Council on June 17, 2025, and certified to the SWRCB <br />on July 24, 2025. Element 9, Monitoring, Tracking, and Reporting System, indicates that the <br />City will annually review the SSMP for effectiveness, make changes to improve program <br />implementation, and annually report key performance indicators to the City Council. <br /> <br />Staff recently completed the annual review for calendar year 2025, and this agenda report <br />serves as that annual update to the City Council. The latest version of the SSMP is available <br />on the City’s website: Sewer System Management Plan. Appendix C, Change Log, documents <br />the changes made since City Council adoption in June 2025. <br />Page 79 of 214
The URL can be used to link to this page
Your browser does not support the video tag.