Laserfiche WebLink
Page 2 of 5 <br /> <br />DISCUSSION <br />Major achievements in implementation of the City’s SSMP during calendar year 2025 are <br />summarized below: <br />• Prepared the SWRCB-required update to the SSMP, which was adopted by the City <br />Council on June 17, 2025, and certified to the SWRCB on July 24, 2025. The next <br />major update is due to the SWRCB by August 1, 2031. <br />• Prepared the SWRCB-required electronic service area map and certified it to the <br />SWRCB on November 18, 2025. <br />• Prepared the City’s Long-Term Sewer Capital Improvement Program (CIP) report, <br />which was approved by the City Council on November 4, 2025. <br />• Updated the City’s Sewer Spill Emergency Response Plan (SERP) based on staff’s <br />annual review. The current SERP is available on the City’s website. <br />• Implemented a new root control program that includes root cutting and chemical <br />applications in target areas identified during pipe inspections to reduce the risk of <br />overflows. <br />• Established the foundational elements of a Sewer Pipe Blockage Control Program <br />(SPBCP) to reduce the risk of overflows associated with food service establishments <br />(FSEs). The SPBCP includes updated outreach and inspection procedures. <br />• Completed construction of the following CIP project: Denker Drive Emergency Repairs. <br />• Began design of the following CIP projects: Emergency Power Improvements and Lift <br />Station 14 Electrical Improvements. <br /> <br />Major goals for implementation of the City’s SSMP during calendar year 2026 are summarized <br />below: <br />• Complete the 2026 sewer rate study, which incorporates recommendations from the <br />Long-Term Sewer CIP Report and an internal resource review related to SSMP <br />implementation. If approved by City Council, rate changes would take effect on January <br />1, 2027. <br />• Use SMART covers to monitor surcharge conditions in pipe segments flagged for <br />monthly maintenance on the City’s hot spot list to reduce the risks of overflows. <br />• Implement a new manhole inspection program using video cameras and 3D-generated <br />models. <br />• Update critical spare parts lists and inventories for fleet vehicles, lift stations, and <br />emergency overflow response. <br />• Prepare lift station emergency response plans. <br />• Begin inspections of FSEs in accordance with the new SPBCP. <br />• Complete design and begin construction of the following CIP projects: Emergency <br />Power Improvements, Lift Station 14 Electrical Improvements, and Sunol Boulevard <br />Sewer Improvements. <br />• Begin study and design of the following CIP projects: Force Main Condition <br />Assessment and Denker Drive Area Sewer Improvements. <br /> <br />Table 9-1 of the SSMP provides a list of key performance indicators established by the City to <br />Page 80 of 214