Laserfiche WebLink
City of Pleasanton <br />Hidden Canyon Residences and Preserve Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 4 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/MMRP/21480016 Hidden Canyon Residences and Preserve Project MMRP.docx <br />Mitigation Measures <br />Method of <br />Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />xx A grazing and/or mowing component, and requirements of any <br />grazing/mowing plan shall also be included. For grazing, this plan <br />shall include applicable stocking rates (based on the best current <br />information), how other sensitive resources occurring on-site such <br />as riparian habitats will be protected (if necessary) and any <br />monitoring requirements, such as the monitoring of Residual Dry <br />Matter (RDM). A mowing plan shall include timing of mowing <br />activities to best enhance habitat for this species. <br />xx A mechanism whereby the RMP shall be funded in perpetuity. <br />Such a mechanism would be the establishment by the applicant of <br />a non-wasting endowment, funded by the applicant and/or <br />through monthly Homeowner Association (HOA) fees. <br />MM BIO-1b: Avoidance and Minimization Measures for California <br />Red-legged Frog <br />Avoidance and Minimization: <br />Conduct protocol-level California red legged frog (CRLF) surveys or <br />assume presence on-site. <br />Implementation of the following measures, partially summarized <br />below, shall be taken during construction to avoid harm or mortality <br />to individual CRLF. <br />xx Conduct protocol-level CRLF surveys or assume presence on the <br />site. <br />xx Prior to the start of construction, an approved qualified Biologist <br />will train all construction personnel regarding habitat sensitivity, <br />identification of special-status species, and required practices. <br />xx Pre-construction surveys shall be conducted to ensure that CRLF <br />are absent from the construction area. If CRLF are present, they <br />shall be relocated by a qualified Biologist. <br />xx The construction zone shall be cleared, and silt fencing shall be <br />erected and maintained around construction zones to prevent <br />CRLF from moving into these areas. <br />City of Pleasanton, <br />Community <br />Development <br />Department <br />Planning Division <br />for review and <br />approval; review of <br />documentation <br />prepared by a <br />qualified or <br />Service-approved <br />Biologist, field <br />verification and site <br />inspections, and <br />review of RMP. <br />Prior to issuance of <br />grading or <br />construction permits; <br />ongoing during <br />construction <br />City of Pleasanton <br />Development <br />Department, <br />Planning Division; <br />applicable regulatory <br />agency (ies) <br />