My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Agenda Packet 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:22:28 AM
Creation date
7/8/2026 11:15:26 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />Hidden Canyon Residences and Preserve Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 5 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/MMRP/21480016 Hidden Canyon Residences and Preserve Project MMRP.docx <br />Mitigation Measures <br />Method of <br />Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />xx A Biological Monitor shall be present on-site during times of <br />construction, such as any impacts to the creek, to ensure no CRLF <br />are harmed, injured, or killed during project buildout. <br /> <br />EACCS-specific CRLF Avoidance Minimization Measures: <br />xx If aquatic habitat is present, a qualified Biologist shall stake and <br />flag an exclusion zone prior to activities. The exclusion zone shall <br />be fenced with orange construction zone and erosion control <br />fencing (to be installed by construction crew). The exclusion zone <br />shall encompass the maximum practicable distance from the work <br />site and at least 500 feet from the aquatic feature wet or dry. <br />xx A qualified Biologist shall conduct pre construction surveys prior to <br />construction activities (before groundbreaking). If individuals are <br />found, work shall not begin until they are moved out of the <br />construction zone to a United States Fish and Wildlife Service <br />(USFWS) or California Department of Fish and Wildlife CDFW) <br />approved relocation site. <br />xx A Service-approved Biologist shall be present for initial ground- <br />disturbing activities. <br />xx If the work site is within the typical dispersal distance (contact <br />USFWS/CDFW for latest research on this distance for species of <br />interest) of potential breeding habitat, barrier fencing shall be <br />constructed around the worksite to prevent amphibians from <br />entering the work area. Barrier fencing shall be removed within 72 <br />hours of completion of work <br />xx No monofilament plastic shall be used for erosion control. <br />xx Construction personnel shall inspect open trenches in the morning <br />and evening for trapped amphibians. <br />xx A qualified Biologist possessing a valid Endangered Species Act <br />Section 10(a)(1)(A) permit or Service approved under an active <br />biological opinion, shall be contracted to trap and to move <br />amphibians to nearby suitable habitat if amphibians are found <br />inside fenced area.
The URL can be used to link to this page
Your browser does not support the video tag.