Laserfiche WebLink
City of Pleasanton <br />Hidden Canyon Residences and Preserve Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 18 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/MMRP/21480016 Hidden Canyon Residences and Preserve Project MMRP.docx <br />Mitigation Measures <br />Method of <br />Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />xx Provide evidence of a suitable water budget to support any <br />created wetland habitats, as determined by a qualified <br />Hydrologist. <br />xx Identify species, size, number, and location of plants to be <br />installed. <br />xx Identify time of year for planting and any methods for <br />supplemental watering during the establishment period. <br />xx Identify the monitoring period for wetlands of no less than 5 years <br />and no less than 10 years for riparian creation/enhancement. <br />xx Identify measures that will be monitored, and define incremental <br />and final success criteria that will be required for the wetland <br />mitigation to be deemed a success. <br />xx Identify adaptive management procedures that accommodate <br />uncertainty that comes with wetland creation projects. These <br />include (but are not limited to) measures to address colonization <br />by invasive species, unexpected lack of water, excessive foraging of <br />installed wetland plants by wildlife, etc. <br />xx Define management and maintenance activities (weeding, repair <br />of water delivery systems and browsing protection, etc.). <br />xx Provide for surety in funding for MMP and for in perpetuity <br />preservation and management of created wetland habitats. <br />MM BIO-5: Tree Preservation Plan: <br />For trees to be retained, a tree preservation plan shall be prepared <br />for the project identifying all protection and mitigation measures to <br />be taken. These measures should remain in place for the duration of <br />construction activities at the project site. <br />The following are recommendations for design and construction <br />phases that will assist in successful tree preservation. <br />Design recommendations <br />a. Locate the trunk of all trees recommended for preservation that <br />are located within 25 feet of the edge of grading and/or utility <br />installation. Include trunk locations and tree tag numbers on all <br />plans. <br />City of Pleasanton <br />Community <br />Development <br />Department <br />Planning Division <br />for review and <br />approval; review of <br />the tree <br />preservation plan <br />prepared by a <br />qualified Biologist <br />and field <br />verification and site <br />Prior to issuance of <br />grading or <br />construction permits; <br />ongoing during <br />construction <br />City of Pleasanton <br />Community <br />Development <br />Department Planning <br />Division <br />