My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Agenda Packet 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:22:28 AM
Creation date
7/8/2026 11:15:26 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />Hidden Canyon Residences and Preserve Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 19 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/MMRP/21480016 Hidden Canyon Residences and Preserve Project MMRP.docx <br />Mitigation Measures <br />Method of <br />Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />b. Establish a Tree Protection Zone (TPZ) around each tree to be <br />preserved. For design purposes, the TPZ shall be 3 feet behind <br />the edge of grading. No grading, excavation, construction or <br />storage of materials shall occur within that zone. <br />c. Install protection around all trees to be preserved. No entry is <br />permitted into a TPZ without permission of the Project <br />Superintendent. <br />d. Use only herbicides safe for use around trees and labeled for <br />that use, even below pavement. <br /> <br />Pre-construction and demolition treatments and recommendations: <br />1. The demolition contractor shall meet with the Consulting <br />Arborist before beginning work to discuss work procedures and <br />tree protection. <br />2. Trees to be preserved may require pruning to provide adequate <br />clearance from construction activities. All pruning shall be <br />performed by a licensed State of California contractor <br />possessing the C61 classification license and the D49 <br />specification. All pruning shall adhere to the latest editions of <br />the American National Standards Institute Z133 and A300 <br />standards. <br />3. Install tree protective fencing at the edge of the TPZ. No grading, <br />construction, installation or other activity is permitted within <br />this area. <br />4. Stake the edge of grading along the East Bay Regional Park <br />District (EBRPD) access road in order to review impacts to trees. <br /> <br />Tree protection during construction: <br />1. Prior to beginning work, contractors working near trees to be <br />preserved shall be required to meet with the Consulting Arborist <br />at the project site to review all work procedures, access routes, <br />storage areas, and tree protection measures. <br />inspections. <br />Approval of tree <br />removal permit.
The URL can be used to link to this page
Your browser does not support the video tag.