Laserfiche WebLink
DRA <br />F <br />T <br /> <br /> <br /> <br /> <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />33 of 36 <br /> <br />107.106. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention <br />devices and above ground irrigation controls shall be located and screened to minimize <br />their visual impacts. These devices with their proposed screening shall be shown on the <br />landscaping and utility plans submitted with the building permit plans or improvement <br />plans and shall be subject to the review and approval of the City Landscape Architect <br />prior to their installation. If above-ground, they shall be painted forest green or an <br />equivalent dark-green color. Screens shall consist of berms, walls, or landscaping <br />satisfactorily integrated into the landscape plan. Landscape screens shall include <br />shrubbery designed by species and planting density to establish a complete screen <br />within 1 year from the date of planting. Weather protection devices, such as measures <br />to protect pipes from freezing, shall require approval by the City Landscape Architect <br />prior to use; at no time shall fabric or other material not designed and/or intended for <br />this purpose be wrapped around or otherwise placed on these devices. Project <br />Specific Condition. <br /> <br />108.107. MAINTENANCE: The project developer and all future owners of the property <br />shall, at no expense to the City, maintain all the landscaped areas related to the project <br />in a healthful, attractive and reasonably weed-free manner consistent with the approved <br />landscape plan, for the duration of the existence of the project. <br /> <br />109.108. SITE LIGHTING: All site lighting shall be designed for consistency with the <br />International Dark-Sky Association’s (IDA) Model Lighting Ordinance. This project site <br />shall be considered to be in an LZ-1 zone for design purposes. Lighting shall be subject <br />to review and approval by the City Landscape Architect prior to building permit <br />issuance. Project Specific Condition. <br /> <br />Trees <br /> <br />110.109. TREE REPORT: The project developer shall provide an update to the tree report <br />prepared by Jim Clark with Hortscience Barltett Consulting, dated December 7, 2020, <br />including the memo dated March 22, 2023, and comply with the recommendations of <br />the updated tree report. The updated report shall include an evaluation based on the <br />latest site and grading plans. No tree trimming or pruning other than that specified in the <br />tree report shall occur. The project developer shall arrange for the Project Arborist to <br />conduct a field inspection prior to building permit issuance to ensure all <br />recommendations have been properly implemented. The Project Arborist shall certify in <br />writing all recommendations have been followed. Project Specific Condition. <br /> <br />111.110. TREE REMOVAL MITIGATION: Any trees approved to be removed by the City <br />shall have its full value paid into the City’s Urban Forestry Fund. A credit for replanting <br />trees shall be as follows: <br />