My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Supplemental Materials 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Supplemental Materials 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:26:29 AM
Creation date
7/8/2026 11:26:08 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRA <br />F <br />T <br /> <br /> <br /> <br /> <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />34 of 36 <br /> <br />a. $250 credit for a 15-gallon size replacement tree; <br /> <br />b. $500 credit for a 24-inch box size replacement tree; and <br /> <br />c. $1,000 credit for a 36-inch box size replacement tree. <br />Project Specific Condition. <br /> <br />112.111. TREE DISPOSITION PLAN: Provide a tree disposition plan that shows trees to <br />remain, trees to be removed, the value of each tree, the total value of the trees to <br />remain and be protected, and the total value of trees to be removed. The plan shall also <br />include the tree protection recommendations from the arborist report. Project Specific <br />Condition. <br /> <br />113.112. TREE BOND: Any tree affected by development/construction must be protected <br />per the Municipal Code. The project developer shall post cash, letter of credit, or other <br />security satisfactory to the Director of Engineering/City Engineer, for all Heritage Trees <br />and any other significant tree as deemed by the City Landscape Architect. This bond or <br />security will be for the value of the tree(s), up to a maximum of $200,000, and shall be <br />held for a minimum of 1 year following acceptance of public improvements or <br />completion of construction, whichever is later, and shall be forfeited if the trees are <br />destroyed or substantially damaged. An arborist shall be onsite during any tree work <br />(i.e. root pruning, trimming, setting up tree protection, etc.). The bond or security m ay be <br />released early with a certification letter by the arborist confirming he/she was present <br />during said tree work and work was performed in accordance with the arborist’s <br />recommendations. Project Specific Condition. <br /> <br />114.113. ROOT CONTROL BARRIER: The project developer shall provide root control <br />barriers and 4-inch perforated pipe for all trees located within 8 feet of pavement or <br />other hardscape, determined by the City Landscape Architect. Root barriers shall be <br />located along the edge of the pavement wherever the tree is within 8 feet of pavement <br />or hardscape. Information and details shall be included in the landscape plan submittal <br />for review and approval by the Landscape Architecture Division. <br /> <br />115.114. TREE PRUNING: Pruning shall be conducted by a certified arborist familiar with <br />the International Society of Arboriculture (ISA) pruning guidelines and shall comply with <br />the guidelines established by the ISA, Tree Pruning Guidelines, current edition, to <br />maintain the health of the trees. <br /> <br />116.115. TREE PROTECTION FENCING: Prior to issuance of a grading or building <br />permit, the project developer shall install temporary 6-foot-tall chain-link fencing (or <br />other fence type acceptable to the Landscape Architecture Division) outside of the <br />existing tree drip lines. The location of the tree protection fencing shall be shown on the
The URL can be used to link to this page
Your browser does not support the video tag.