Laserfiche WebLink
DRA <br />F <br />T <br /> <br /> <br /> <br /> <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />35 of 36 <br /> <br />demolition plans (if applicable), grading, building, and/or landscape plans. The fencing <br />shall remain in place until final landscape inspection by the Landscape Architecture <br />Division. Removal of such fencing prior to approval may result in a “stop work ord er.” <br /> <br /> <br />OPERATIONS SERVICES DEPARTMENT – ENVIRONMENTAL SERVICES/UTILITIES <br />DIVISION – 925-931-5500 <br /> <br />117.116. SEWER LINE: The sewer line shall be private from the new manhole on (insert <br />street name) into the development. Prior to building permit submittal, the project plans <br />shall be revised to reflect this requirement. <br /> <br />118.117. BACKFLOW PREVENTION ASSEMBLIES: Backflow preventer assemblies shall <br />be designed and installed in accordance with current City Standards 704, 705, 706; <br />State Health and Safety Code; Title 17; and as required by the Director of Operations <br />and Water Utilities. All backflow preventer assemblies shall be tested and certified by a <br />City approved tester with the certification submitted to the City’s contractor, Aqua <br />Backflow. Testing will be performed at the time City water is turned on to the site. If an <br />existing backflow preventer is on the site it shall be tested and certified by an approved <br />tester with the certification submitted to the City’s contractor, Aqua Backflow, before <br />project water is drawn through it. An all-weather cover shall be placed over all backflow <br />prevention assemblies 4 inch and smaller. <br /> <br />119.118. RECYCLED WATER: Recycled water should be used on site during the grading <br />and construction period. However, under any declared stage of water shortage, <br />recycled water must be used throughout the grading and construction period. <br /> <br />TRAFFIC ENGINEERING DIVISION – 925-931-5677 <br /> <br />Traffic Control <br /> <br />120.119. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall <br />be submitted to the City Traffic Engineer for review and approval. Best management <br />practices to minimize traffic impacts shall be used during construction, including <br />scheduling of major truck trips and deliveries, to avoid peak travel hours. The TCP shall <br />have proper lane closure procedures such as flagger stations, signage, cones, and <br />other warning devices implemented during construction. The TCP shall also include <br />time of day/hours of lane closures and total number of days. <br /> <br />121.120. TRUCK ROUTES: The haul route for all materials to and from the project site <br />shall be reviewed and approved by the City Traffic Engineer prior to building permit <br />issuance and shall include the provision to monitor the street surfaces used for the haul