Laserfiche WebLink
DRA <br />F <br />T <br /> <br /> <br /> <br /> <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />3 of 36 <br /> <br />including defensible space and fuel management zones, and compliance with applicable <br />Building and Fire Codes. <br /> <br />Stormwater runoff would be managed through on-site drainage facilities and water quality <br />treatment measures consistent with City and regional requirements. Construction impacts <br />would be minimized through standard conditions of approval, including construct ion hour <br />limitations and dust control measures. While the Project would result in significant and <br />unavoidable vehicle miles traveled (VMT) impacts, these impacts are typical of residential <br />development in similar locations and are outweighed by the Project’s public benefits, <br />including housing production, open space preservation, and public access improvements. <br />Therefore, the Project is in the best interests of the public health, safety, and general <br />welfare, and this finding can be made. <br /> <br />2. Whether the plan is consistent with the City's General Plan and any applicable <br />specific plan: <br /> <br />The Project is consistent with the General Plan, as amended, including land use <br />designations of Low Density Residential and Open Space. The proposed density is <br />consistent with the allowable range for the site, and the Project has been designed to <br />cluster development in less constrained areas while preserving substantial open space. <br />The Project site is identified in the City’s Housing Element as an opportunity site, and the <br />proposed development would contribute toward meeting the City’s regional housing needs <br />allocation (RHNA). The Project also supports General Plan policies related to open space <br />preservation, hillside development, and provision of recreational amenities through <br />dedication of land to the EBRPD and construction of a public staging area and trail <br />connections. Therefore, the Project is consistent with the General Plan, and this finding can <br />be made. <br /> <br />3. Whether the plan is compatible with previously developed properties in the vicinity <br />and the natural, topographic features of the site: <br /> <br />The Project site is located in a semi-rural hillside area characterized by low-density <br />residential development and open space. The proposed development is designed to be <br />compatible with this setting by clustering homes, maintaining large areas of open space, <br />and limiting grading in sensitive areas. <br /> <br />The site design avoids development of residences and structures on slopes exceeding 25 <br />percent and preserves a significant amount of natural landforms. Architectural design and <br />landscaping further ensure compatibility with the surrounding environment. The dedication <br />of open space enhances compatibility with adjacent regional parklands and preserves the <br />natural character of the area. Therefore, the Project is compatible with surrounding <br />development and site characteristics, and this finding can be made. <br />