My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Supplemental Materials 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Supplemental Materials 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:26:29 AM
Creation date
7/8/2026 11:26:08 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRA <br />F <br />T <br /> <br /> <br /> <br /> <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />4 of 36 <br /> <br />4. Whether grading takes into account environmental characteristics and is designed in <br />keeping with the best engineering practices to avoid erosion, slides, or flooding to <br />have as minimal an effect upon the environment as possible. <br /> <br />Grading has been minimized and designed to respond to existing topography, with <br />development concentrated in less constrained areas of the site. The Project avoids grading <br />on slopes greater than 25 percent to accommodate structures and incorporates <br />geotechnical recommendations to ensure slope stability and structural integrity. <br /> <br />Drainage improvements, including on-site detention and stormwater treatment facilities, <br />would be implemented to ensure that post-development runoff does not exceed pre- <br />development conditions and to prevent flooding or erosion. Erosion control and dust <br />suppression measures would be implemented during construction. Mitigation measures <br />identified in the Environmental Impact Report address geology, soils, and hydrology to <br />ensure impacts are reduced to less than significant levels. Therefore, grading is <br />appropriately designed, and this finding can be made. <br /> <br />5. Whether streets, buildings, and other manmade structures have been designed and <br />located in such a manner to complement the natural terrain and landscape: <br /> <br />The Project’s internal circulation system follows the natural contours of the site to minimize <br />grading and visual impacts. Residential lots are clustered in areas with more moderate <br />slopes, preserving the majority of the site as open space. <br /> <br />Building placement, orientation, and design have been carefully considered to reduce <br />visual prominence and integrate with the surrounding landscape. Landscaping with native <br />and drought-tolerant species further enhances the site’s natural character. The inc lusion of <br />a public staging area and trail connections complements the surrounding open space and <br />recreational uses. Therefore, streets and buildings have been designed to complement the <br />natural terrain, and this finding can be made. <br /> <br />6. Whether adequate public safety measures have been incorporated into the design of <br />the plan: <br /> <br />The Project includes multiple public safety features, including roadway improvements, a <br />signalized intersection, and site access designed to meet City standards for visibility and <br />emergency response. Internal roadways are designed to accommodate emergency <br />vehicles, including adequate turning radii and access to all structures. <br /> <br />The Project incorporates fire protection measures such as defensible space, fuel <br />management zones, and compliance with Wildland-Urban Interface (WUI) requirements. All <br />structures would be constructed in accordance with applicable Building and Fire Codes and <br />would include fire suppression systems. Therefore, adequate public safety measures have <br />been incorporated into the Project design, and this finding can be made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.