Laserfiche WebLink
<br />building, with units ranging in size from approximately 430 square feet to 13,626 square feet <br />and associated site improvements. As proposed, the project plans are incomplete, and the <br />project is inconsistent with the General Plan, applicable Objective Design Standards (ODS), <br />the Downtown Specific Plan (DSP), and the Pleasanton Municipal Code (PMC) regulations. <br />While the PUD process allows for deviations from the strict application of various standards, <br />staff finds that the extent to which the project would deviate from these standards, and from <br />the intent and policies of the Downtown Specific Plan, do not allow the necessary findings for <br />approval to be made. <br /> <br />BACKGROUND <br />On September 30, 2024, the applicant first submitted applications for Rezoning, a Certificate of <br />Appropriateness, and a PUD Development Plan that originally proposed a three-story mixed- <br />use project consisting of 3,110 square feet of ground-floor commercial floor area and a 14,334 <br />square-foot single-family residence occupying all three floors. In staff’s initial review, there <br />were concerns regarding non-conformance with the site’s minimum densities, the applicable <br />ODS for the MU-T District, and the PMC. Staff also identified concerns regarding the proposed <br />project’s ability to satisfy the PUD findings required pursuant to Section 18.68.110.B.1 through <br />7 of the PMC: <br /> <br />1. Whether the proposed development plan is in the best interest of the public health, <br />safety, and general welfare. <br />2. Whether the proposed development plan is consistent with the Pleasanton General <br />Plan and any applicable specific plan. <br />3. Whether the proposed development plan is compatible with the previously <br />developed properties in the vicinity and the natural, topographic features of the site. <br />4. Whether grading in conjunction with the proposed development plan takes into <br />account environmental characteristics and is designed in keeping with the best <br />engineering practices to avoid erosion, slides, or flooring, and to have as minimal an <br />effect upon the environment as possible. <br />5. Whether streets, buildings, and other manmade structures have been designed and <br />located in such a manner to complement the natural terrain and landscape. <br />6. Whether adequate public safety measures have been incorporated into the design or <br />the proposed development plan. <br />7. Whether the proposed development plan conforms to the purposes of the PUD <br />district. <br /> <br />The applicant engaged with staff multiple times between September 2024 and August 2025 to <br />review various iterations of a residential-only project. Staff evaluated these proposals based on <br />the subject site’s current land use designations and in each case found them to be <br />noncompliant, or to raise significant concerns about the overall compatibility of the project with <br />the Downtown Specific Plan’s policies with respect to aspects such as inclusion of ground floor <br />commercial space, pedestrian orientation and activation, density, and design. <br /> <br />Planning Commission Workshop <br />The Planning Commission reviewed a previous version of this project at a workshop on August <br />27, 2025. At that time, the project proposed to demolish the existing office building and <br />construct a new, approximately 38-foot-tall, three-story, residential building consisting of an <br />approximately 15,088 square-foot single-family residence with an approximately 725-square-