P25-0116. P25-0116, P25-0018, PUD-154 and Tract 8123 (Arroyo Lago) Planning Commission <br />16 of 22 <br />includes the Kiewit and Arroyo Lago projects and assumes El Charro Road is not extended, <br />and a scenario that assumes El Charro Road is extended between Stoneridge Drive and <br />Busch Road. <br /> <br />The TIA indicates that “Under Existing and Existing Plus Project conditions, all study <br />intersections are expected to operate acceptably at level of service (LOS) D or better, except <br />for the Santa Rita Road at Valley Avenue intersection, which operates at LOS E during the <br />evening peak hour. Minor signal timing adjustments, such as allocating additional green time to <br />the eastbound left-turn movement, would improve operations at this intersection to LOS D. The <br />95th percentile queueing analysis indicates that while a few turn movements are projected to <br />exceed available storage, optimizing signal timing would reduce queues to available storage <br />lengths.” <br /> <br />The TIA also states that “Under General Plan buildout conditions, the intersection of Santa Rita <br />Road at Valley Avenue is forecast to operate below the city’s LOS D standard across all <br />scenarios during the morning and evening peak hours; also, 95th percentile queues are <br />expected to exceed available storage for key movements at the intersection. With <br />implementation of the city’s planned intersection upgrades -- specifically the addition of <br />southbound and westbound left-turn lanes and optimization of signal timing splits—overall <br />operations would improve to LOS D or better. Queueing conditions would also improve, with <br />95th-percentile queues expected to remain within available storage lengths following <br />these improvements. Consistent with the El Charro Road Extension Assessment, these results <br />also confirm that extending El Charro Road would further enhance corridor performance and <br />reduce congestion on Santa Rita Road.” <br /> <br />The TIA confirms that the proposed Project can be accommodated within the City’s circulation <br />system with the implementation of the targeted intersections. The City Traffic Engineer <br />reviewed the TIA and concurred with its analysis. <br /> <br />In addition to the improvements identified in the TIA, the Project would be required to develop <br />all internal streets to the City’s standards and to make frontage improvements along Busch <br />Road, including sidewalk, curb/gutter, travel lane striping, etc. Specifically, the Project is <br />required to construct a roundabout at the Busch Road/Street B intersection. <br /> <br />The Project is also required to construct the extension of a Class I trail with a minimum width of <br />10 feet along the east side of Street A from Street D to Busch Road. The trail design must <br />meet the standards set forth in the Bicycle and Pedestrian Master Plan and the Trails Master <br />Plan. The required improvements have been reflected in the Project’s conditions of approval. <br /> <br />Further, as analyzed in the CEQA Addendum, the Project would result in Vehicle Miles <br />Traveled (VMT) impacts that exceed applicable adopted regulatory thresholds. While feasible <br />mitigation measures would be implemented to reduce VMT, including design features that <br />support alternative modes of transportation, these impacts would remain significant and <br />unavoidable. Additional discussion on this item is in the Environmental Assessment section of <br />this report. <br /> <br />Notwithstanding the VMT findings, the proposed circulation improvements would enhance local <br />traffic operations and safety on Busch Road and the local road network. <br />