My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 06242026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
06-24
>
Planning Commission Meeting Agenda Packet 06242026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 12:33:43 PM
Creation date
7/8/2026 12:22:27 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
6/24/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
722
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P25-0116. P25-0116, P25-0018, PUD-154 and Tract 8123 (Arroyo Lago) Planning Commission <br />17 of 22 <br /> <br />Grading and Drainage <br />In consideration of the existing residential development on the west side, the proposed <br />Project’s grading has been modified to reduce the relative elevation differences between the <br />proposed project and adjacent homes, further reducing the potential for shadowing, light spill, <br />and glare intrusion onto nearby residential properties. As shown on the Grading Plan <br />(C3.1/Exhibit B), the proposed lots along the west property line would have a comparable pad <br />elevation as the existing homes. Please refer to Figure 5. <br /> <br />Figure 5: Pad Elevation Comparison <br /> <br />A comprehensive drainage strategy has been incorporated into the Project design to ensure <br />that post-development runoff does not exceed pre-development conditions. Stormwater runoff <br />would be managed through a combination of on -site detention, drainage improvements, and <br />best management practices (BMPs) in compliance with City standards and regional <br />requirements. The Project would be required to prepare and implement a Stormwater Control <br />Plan, consistent with the requirements of the Alameda County Clean Water Program, to <br />address water quality, erosion control, and long-term maintenance of drainage facilities. With <br />implementation of these measures, grading and drainage impacts would meet all regulatory <br />requirements, and any potential environmental impacts would be less than significant. <br /> <br />In larger storm events, stormwater would be temporarily stored in a detention basin just <br />northeast of the bioretention area. The detention basin has been sized to accommodate back - <br />to-back 100-year storm events in accordance with all applicable standards an d requirements, <br />allowing stormwater discharge to be metered to ensure that the capacity of the City’s storm <br />drain system is not exceeded. <br /> <br />Given that this stormwater retention area is located on an off-site piece of land owned by the <br />applicant (Figure 6), staff has included a condition of approval requiring a storm drain <br />easement to be granted to the City for maintenance of the stormwater retention facility.
The URL can be used to link to this page
Your browser does not support the video tag.