My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 7-21-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
072126 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 7-21-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2026 11:36:47 AM
Creation date
7/16/2026 11:22:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
928
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Todd Yamello <br />May 26, 2026 <br />Page 8 <br /> <br /> <br /> <br />Server Relocation (Task 4) and OT System Monitoring Implementation (Task 6) to confirm that <br />the implementation of these projects are consistent with the Basis of Design, operational <br />continuity needs, cybersecurity objectives, and SCADA resilience goals. Support may include <br />participation in coordination meetings; review of relocation concepts, implementation plans, <br />vendor materials and proposals, equipment selections, proposed architectures, network and <br />virtualization approaches, backup and recovery strategies, integration approaches, <br />testing/cutover procedures, and procurement-related technical information; and <br />recommendations related to OT asset visibility, vulnerability management, threat detection, log <br />aggregation, alerting, forensic capability, and IT security integration. <br />• On-Call SCADA Integration RFQ Development – West Yost will support the City in developing an <br />RFQ to establish a pool of qualified SCADA system integrators for on-call services. This includes <br />preparing the RFQ, defining evaluation criteria, reviewing submittals, and supporting the City <br />through the selection process. <br />Task 7 Assumptions <br />• West Yost will perform additional, as-needed services up the amount allocated to this task only after <br />receiving a request and written authorization from the City. <br />• West Yost will provide a separate estimate for each request on a time-and-materials basis up to the <br />level of effort shown in Table 1. <br /> <br />Task 7 Deliverables <br />• Deliverables are TBD based on services requested by the City. <br /> <br />Page 123 of 923
The URL can be used to link to this page
Your browser does not support the video tag.