Page 1 of 2 <br />Item #10 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />July 21, 2026 <br />Public Works - Engineering Division <br /> <br />TITLE: ACCEPT PUBLIC IMPROVEMENTS PERFORMED BY DPI, INC., FOR THE <br />ANNUAL STORM DRAIN REPAIR/REPLACEMENT (PURI COURT) PROJECT, <br />CIP 24415 AND 25415, AND APPROVE A BUDGET AMENDMENT TO THE <br />STORM DRAIN REPLACEMENT FUND <br /> <br />SUMMARY <br />The project includes storm drain improvements on Puri Court, including replacement of <br />existing buried pipes with new, larger pipes and installation of a new box culvert to improve <br />flow capacity and reduce future flood risk. The project was initiated in response to storm <br />events during the winter of late 2022 through early 2023 when runoff from the hillside west of <br />Foothill Road overwhelmed the storm drain network serving Foothill Road and Puri Court. <br /> <br />On April 15, 2025, the City Council awarded a construction contract to DPI, Inc., for CIP Nos. <br />24415 and 25415, with total project expenditures anticipated at $1,827,201. The work has <br />been completed to the satisfaction of the Public Works Director and in accordance with the <br />approved plans and special provisions. Staff recommends that the City Council accept the <br />project as complete. <br /> <br />RECOMMENDATION <br />1. Accept the Annual Storm Drain Repair/Replacement (Puri Court) project, CIP 25415, as <br />complete and authorize the City Clerk to file a Notice of Completion pursuant to <br />California Civil Code section 9204; <br />2. Authorize the release of retention in the amount of $57,504.29 to DPI, Inc., 30 calendar <br />days after recordation of the Notice of Completion; and <br />3. Approve a budget amendment returning $558,382 in remaining project funding to the <br />Annual Storm Drain Repair/Replacement Fund (Fund 441) for future eligible projects. <br /> <br /> <br />BACKGROUND <br />The project was advertised, and sealed bids were opened on March 25, 2025. A total of nine <br />bids were received, ranging from $1,084,777 to $1,834,000. DPI, Inc., submitted the lowest <br />responsive bid in the amount of $1,084,777, which was 19 percent lower than the Engineer’s <br />Estimate. The Public Works Director was authorized to approve change orders up to the <br />project contingency amount of $157,317. The project also required expenditures for consultant <br />contracts and related services, as detailed in Attachment 2. <br /> <br />DISCUSSION <br />The project included replacement of 415 lineal feet of storm drain pipe and 52 lineal feet of box <br />culvert, installation of a storm manhole, a headwall, and minor concrete and landscape <br />restoration in areas where excavation affected front yards within the residential neighborhood. <br />Page 133 of 923