My WebLink
|
Help
|
About
|
Sign Out
MUNCICIPAL & INDUSTRIAL WATER SUPPLY
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
MUNCICIPAL & INDUSTRIAL WATER SUPPLY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2026 2:52:45 PM
Creation date
7/30/2026 2:36:55 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
7/20/2026
LONG TERM AGREEMENTS - NAME
Zone 7
LONG TERM AGREEMENTS - TYPE
WATER SERVICES AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
20 YR
LONG TERM AGREEMENTS - NOTES
MUNIS #2027022
Document Relationships
ZONE 7 - MUNCICIPAL & INDUSTRIAL WATER SUPPLY (#2027022)
(Message)
Path:
\CITY CLERK\CONTRACTS\Z
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
exclusive Groundwater Sustainability Agency for its boundaries, will provide <br /> prompt notice to Contractor where it has reason to believe that any such <br /> extraction does not meet this bar. <br /> e) Where the Alternate Supply is recycled wastewater treated by a Zone 7 <br /> M&I Contractor for reuse as permitted by the State Water Resources <br /> Control Board's Division of Drinking Water, the Regional Water Quality <br /> Control Board and other agencies with jurisdiction. <br /> In addition to the foregoing, Contractor may be excused from its obligation to purchase <br /> water solely from Zone 7 or through exercise of its Groundwater Pumping Quota where <br /> (1) the Board provides prior written approval for the Contractor to receive Alternate <br /> Supply in lieu of Zone 7 deliveries; and (2) the Contractor has compensated Zone 7 for <br /> its obligated fixed costs associated with the quantity of Zone 7-delivered water that the <br /> Contractor intends to forgo. These fixed costs shall include but are not limited to water <br /> facility improvements, water contract obligations, debt service, and other costs <br /> ordinarily recovered through the sale of water to Contractor. Contractor written <br /> requests to receive an Alternate Supply pursuant to this paragraph shall be promptly <br /> considered by Zone 7 and approval shall not be unreasonably withheld. <br /> Zone 7 needs to be protected from any obligation to supply water to projects or <br /> customers which the Contractor has supplied from sources other than what has been <br /> directly purchased from Zone 7. In addition to the protections provided in Section 43, <br /> Contractor shall indemnify, save and hold harmless Zone 7 from any and all obligations, <br /> liability, responsibility, costs, expenses, or fees associated in any way with any <br /> Contractor's acquisition and delivery of Alternate Supply pursuant to this Section. <br /> Provided, however, that if Contractor is instructed by Zone 7 to acquire water from <br /> Zone 7 pursuant to Zone 7's rights as exclusive provider under Section 5, and which has <br /> been previously acquired from third parties as an Alternate Supply pursuant to this <br /> Section 9, Zone 7 shall save and hold harmless Contractor from any and all obligations, <br /> liability, responsibility, costs, expenses, or fees that may arise from such third parties as <br /> a result of that change. <br /> 10. Measurement of Treated Water Deliveries <br /> a) Zone 7 shall measure and record the volumes of water that Zone 7 delivers to <br /> Contractor. In the event that a flow meter is inoperable, malfunctioning, or in <br /> error (including any testing done under Sections 10(b) or 10(c)), such that water <br /> delivery volumes are not accurately recorded or measured within 2%, Zone 7 <br /> shall confer with the Contractor prior to making a reasonable estimation of water <br /> deliveries to the Contractor during that period of inoperability, malfunction or <br /> error, up to a maximum adjustment period of 6 months. <br /> b) Zone 7 shall test turnout meters at least annually, consisting of verifying and <br /> adjusting meters and associated instrumentation, using a method approved by <br /> Zone 7 consistent with meter manufacturer instructions or with industry <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.