Laserfiche WebLink
exclusive Groundwater Sustainability Agency for its boundaries, will provide <br /> prompt notice to Contractor where it has reason to believe that any such <br /> extraction does not meet this bar. <br /> e) Where the Alternate Supply is recycled wastewater treated by a Zone 7 <br /> M&I Contractor for reuse as permitted by the State Water Resources <br /> Control Board's Division of Drinking Water, the Regional Water Quality <br /> Control Board and other agencies with jurisdiction. <br /> In addition to the foregoing, Contractor may be excused from its obligation to purchase <br /> water solely from Zone 7 or through exercise of its Groundwater Pumping Quota where <br /> (1) the Board provides prior written approval for the Contractor to receive Alternate <br /> Supply in lieu of Zone 7 deliveries; and (2) the Contractor has compensated Zone 7 for <br /> its obligated fixed costs associated with the quantity of Zone 7-delivered water that the <br /> Contractor intends to forgo. These fixed costs shall include but are not limited to water <br /> facility improvements, water contract obligations, debt service, and other costs <br /> ordinarily recovered through the sale of water to Contractor. Contractor written <br /> requests to receive an Alternate Supply pursuant to this paragraph shall be promptly <br /> considered by Zone 7 and approval shall not be unreasonably withheld. <br /> Zone 7 needs to be protected from any obligation to supply water to projects or <br /> customers which the Contractor has supplied from sources other than what has been <br /> directly purchased from Zone 7. In addition to the protections provided in Section 43, <br /> Contractor shall indemnify, save and hold harmless Zone 7 from any and all obligations, <br /> liability, responsibility, costs, expenses, or fees associated in any way with any <br /> Contractor's acquisition and delivery of Alternate Supply pursuant to this Section. <br /> Provided, however, that if Contractor is instructed by Zone 7 to acquire water from <br /> Zone 7 pursuant to Zone 7's rights as exclusive provider under Section 5, and which has <br /> been previously acquired from third parties as an Alternate Supply pursuant to this <br /> Section 9, Zone 7 shall save and hold harmless Contractor from any and all obligations, <br /> liability, responsibility, costs, expenses, or fees that may arise from such third parties as <br /> a result of that change. <br /> 10. Measurement of Treated Water Deliveries <br /> a) Zone 7 shall measure and record the volumes of water that Zone 7 delivers to <br /> Contractor. In the event that a flow meter is inoperable, malfunctioning, or in <br /> error (including any testing done under Sections 10(b) or 10(c)), such that water <br /> delivery volumes are not accurately recorded or measured within 2%, Zone 7 <br /> shall confer with the Contractor prior to making a reasonable estimation of water <br /> deliveries to the Contractor during that period of inoperability, malfunction or <br /> error, up to a maximum adjustment period of 6 months. <br /> b) Zone 7 shall test turnout meters at least annually, consisting of verifying and <br /> adjusting meters and associated instrumentation, using a method approved by <br /> Zone 7 consistent with meter manufacturer instructions or with industry <br /> 6 <br />