practices. Results of this testing and adjustments (if any) made to the meter and <br /> associated instrumentation shall be provided promptly to Contractor. The <br /> Contractor shall have the right to be represented by a qualified observer during <br /> any instrumentation and/or meter tests and/or verification. <br /> c) Contractor may request additional testing of its turnout meters between Zone 7's <br /> regularly scheduled annual testing intervals at Contractor's expense. The testing <br /> shall be consistent with standard methods recommended by the meter <br /> manufacturer, or other methods consistent with industry practices, as agreed <br /> upon by the Contractor and Zone 7. In the event testing demonstrates an error <br /> exceeding 2%, the expenses of the test will be assumed by Zone 7. <br /> 11. Delivery Schedule of Municipal & Industrial Water <br /> Contractor shall submit a preliminary water delivery schedule annually on a form <br /> provided by Zone 7. This preliminary water delivery schedule will include: (1) an <br /> estimate of the Contractor's demand for treated water and groundwater in excess of its <br /> Groundwater Pumping Quota required by Contractor for the succeeding 5 calendar <br /> years, set out on a monthly basis; and (2) the anticipated Maximum Day Treated Water <br /> Demand from Zone 7 for each such year. <br /> Zone 7 shall review Contractor's preliminary water delivery schedule, and shall either <br /> approve the schedule or make such revisions as may, in the judgment of Zone 7, be <br /> necessary to make deliveries to Contractor. <br /> Zone 7 will use its best efforts to meet Contractor's water delivery requests. To the <br /> extent water is available to Zone 7, Zone 7 will approve each M&I Contractor's annual <br /> delivery schedule for an amount not less than the amount of water set forth in that <br /> Contractor's delivery schedule for the prior calendar year. Zone 7 shall identify the <br /> reason for any revisions or disapproval of Contractor's delivery request. Zone 7 shall <br /> only revise or disapprove Contractor's delivery request for the reasons set forth in <br /> Sections 7, 12, 13, and 14. <br /> 12. Operational Requirements <br /> The Zone 7 system is not designed to serve all M&I Contractors' peak demands <br /> simultaneously, and peak deliveries may be curtailed or unintentionally reduced from <br /> time to time in response to limitations in system capacity. Zone 7 may at its sole <br /> discretion elect to regulate flows, provided, however, that so long as water and Zone 7 <br /> system capacity are available, Zone 7 will endeavor to meet all reasonable demands for <br /> peak deliveries and will use reasonable diligence to provide a regular and uninterrupted <br /> supply of water from its turnout facilities. Zone 7 shall communicate its actions to <br /> regulate or reduce flows to the Contractors as soon as reasonably practicable. <br /> 7 <br />