Laserfiche WebLink
13. Temporary Curtailment of Delivery <br /> Zone 7 will make all reasonable efforts to provide continuous service to Contractor but <br /> may schedule to temporarily discontinue or reduce the delivery of water to Contractor <br /> for the purpose of necessary investigation, inspection, maintenance, repair or <br /> replacement of any of the facilities necessary for the delivery of treated water to <br /> Contractor. <br /> Zone 7 shall notify Contractor as far in advance as possible of any scheduled <br /> discontinuance or reduction and the estimated duration of such discontinuance or <br /> reduction, and shall use its best efforts to avoid disruptions in service to Contractor. <br /> In the event of any discontinuance or reduction in delivery of water, Contractor may <br /> elect to reschedule the water otherwise identified for delivery in the approved water <br /> delivery schedule, subject to the availability of system capacity and considering the <br /> approved delivery schedules of all other M&I Contractors. <br /> 14. Suspension of Service <br /> In the event that Contractor shall be delinquent in the payment for water for more than <br /> 90 days after the due date (as said due date is defined in Section 32), such delinquency <br /> shall be called to the attention of the Board for resolution. The Board may, in its <br /> discretion and after giving Contractor an opportunity to be heard, order the suspension <br /> or reduction of service to Contractor. <br /> C. TURNOUT DESIGN & CONSTRUCTION <br /> 15. Requests for Turnout Facilities <br /> Requests for additional turnout facilities are subject to review and approval by Zone 7. <br /> Prior to the design or construction of a turnout facility, Contractor shall deposit with <br /> Zone 7 an amount of money estimated by Zone 7 to cover all costs to be incurred by <br /> Zone 7 for that design or construction. Such costs include but are not limited to design, <br /> engineering, design review, construction, right-of-way acquisition, inspection, <br /> landscaping, installation, and contract administration. At Zone 7's sole discretion, such <br /> costs may be included in the monthly invoices provided to Contractor pursuant to <br /> Section 32. <br /> Following the completion of the design or construction of the turnout facility, Zone 7 will <br /> provide Contractor with an accounting of the actual costs incurred by Zone 7 in the <br /> completion of that design or construction. The deposit shall be applied to the actual costs <br /> incurred by Zone 7, and the appropriate refund or invoicing to Contractor will be made. <br /> Contractor shall make payment; or Zone 7 shall issue a refund on any excess remaining <br /> deposit, within 30 days of Zone 7's submission of said statement. Contractor shall have <br /> the right to audit the records of Zone 7 for the purpose of verifying actual costs. <br /> 8 <br />