My WebLink
|
Help
|
About
|
Sign Out
PC-2026-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:27:46 AM
Creation date
8/4/2026 8:25:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />34 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />Facts in Support of Findings: No Lead Agency-determined TCRs were identified during Tribal <br />consultation efforts conducted by the City pursuant to Assembly Bill (AB) 52 on September 18, 2025, <br />which was conducted in accordance with the criteria set forth in subdivision (c) of Public Resources <br />Code Section 5024.1. The City sent consultation letters to each Tribe on the NAHC consultation list. <br />To date, no responses requesting to consult have been received. Although the proposed project <br />would implement the City’s standard COA CUL-3 to ensure consistency with Housing Element <br />Program 5.3, out of an abundance of caution in the event TCRs are uncovered during project <br />construction, the proposed project would also implement MM CUL-2. Through implementation of <br />MM CUL-2, the proposed project would reduce impacts on Lead Agency-determined TCRs to less <br />than significant. <br />The Lead Agency finds that MM CUL-5 is feasible, is adopted, and will further reduce impacts related <br />to Lead Agency determined TCRs. Accordingly, the Lead Agency finds that, pursuant to Public <br />Resources Code Section 21081(a)(1) and CEQA Guidelines Section 15091(a)(1), changes or <br />alterations have been required in, or incorporated into, the proposed project that mitigate or avoid <br />the potentially significant impacts as identified in the EIR. Therefore, impacts associated with Lead <br />Agency-determined TCRs would be less than significant with mitigation incorporated. <br />1.6.9 - Impact GEO-1: Seismic-Induced Ground Failure and Landslides <br />Impact GEO-1: The proposed project would not directly or indirectly cause potential substantial <br />adverse effects, including the risk of loss, injury or death involving: <br />i. Rupture of a known earthquake fault, as delineated on the most recent Alquist- <br />Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area <br />or based on other substantial evidence of a known fault. Refer to Division of <br />Mines and Geology Special Publication 42. <br />ii. Strong seismic ground shaking. <br />iii. Seismic-related ground failure, including liquefaction. <br />iv. Landslides. <br />Findings: Less than significant impact with mitigation incorporated. (Draft EIR, p. 3.6-28). <br />Changes or alterations have been required in, or incorporated into, the project <br />which avoid or substantially lessen the significant environmental effects as identified <br />in the EIR. (CEQA Guidelines § 15091(a)(1)). <br />Mitigation Measures <br />MM GEO-1 Design-level Geotechnical Study <br />Prior to the issuance of any building or grading permits, a design-level geotechnical <br />investigation on the project site and review of detailed site plans shall be performed <br />by a qualified Geotechnical Engineer. The design-level geotechnical investigation <br />could incorporate a variety of field methods and would include (but not be limited <br />to) the following items: <br /> <br /><br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.