Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR Responses to Written Comments <br /> <br /> <br />FirstCarbon Solutions 3-27 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />Local Agencies <br />Dublin San Ramon Services District (DSRSD) <br />Response to DSRSD-1 <br />This comment provides introductory remarks and is included in the administrative record. The <br />comment did not provide new, substantial evidence with respect to the disposition of significant <br />environmental impacts evaluated in the Draft EIR. Therefore, no further response is required. <br />Response to DSRSD-2 <br />Wastewater treatment and conveyance services for the proposed project would be provided by the <br />City. The City owns and operates sanitary sewer lines throughout the City, and conveys wastewater <br />to the DSRSD regional Wastewater Treatment Plant (WWTP). Through a contract agreement with the <br />City, DSRSD provides wastewater treatment services to the City. <br />As discussed in Draft EIR Section 3.15, Utilities and Service Systems, page 3.15-15, DSRSD’s Recycled <br />Water Treatment Facility (RWTF) provides primary, secondary, and tertiary wastewater treatment, <br />and has an average dry-weather wastewater flow (ADWF) design capacity of 17 million gallons per <br />day (mgd). The City is currently entitled to half of this treatment capacity, or 8.5 mgd. At the time of <br />the last General Plan Amendment, the City’s average annual wastewater flow was approximately 6 <br />mgd. Thus, the current 8.5 mgd wastewater treatment capacity is sufficient to serve the City’s <br />planned buildout growth as anticipated in the City’s General Plan, including the City’s updated <br />Housing Element adopted in 2023, which included the project site as a Housing Element Opportunity <br />site. In their comment in response to review of the Draft Program EIR for the 2023-2031 Housing <br />Element (SCH Number 2022040091), DSRSD stated, “the RWTF serving the City would have adequate <br />capacity to treat the potential increase in wastewater flow associated with Housing Element <br />requirements.” DRSD further indicated that an update to the 2017 RWTP Master Plan was planned <br />for 2024 that would evaluate changed conditions that may impact future loading capacity. As of the <br />preparation of the Final EIR for the proposed project, this update has not been completed. The City <br />shall participate in a wastewater loading study with the DSRSD to assure that the proposed project’s <br />generated wastewater would be sufficiently treated given existing treatment capacity.1 <br />As part of its ongoing master planning process, DSRSD will identify actions that will need to be <br />implemented to accommodate the increased loading generated by customers within its service area <br />through the future planning horizon year (2050). Any identified changes to the DSRSD treatment <br />process will be funded through increases in customer service rates and through connection fees <br />imposed upon future projects, including the proposed project. The proposed project would be <br />required to pay applicable fees to reflect its fair share contribution to the DSRSD in support of <br />maintenance of its existing facilities and any planned equipment or process refinements identified as <br />part of its master planning. <br />Further, as stated on page 3.15-18 of the Draft EIR, the proposed project would generate <br />approximately 0.01 mgd of wastewater flows. This amount of wastewater generation would <br />represent approximately 0.1 percent of the DSRSD RWTF treatment capacity that the City is entitled <br />to. The proposed project, in combination with the most recent wastewater flow estimates, would <br /> <br />1 Personal email communication with Jackie Yee on behalf of the Dublin San Ramon Services District (DSRSD) on February 2, 2026. <br />   <br /><br /> <br /> <br />