My WebLink
|
Help
|
About
|
Sign Out
PC-2026-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:27:46 AM
Creation date
8/4/2026 8:25:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Responses to Written Comments Final EIR <br /> <br /> <br />3-28 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />account for approximately 6.01 mgd of the available 8.5 mgd of wastewater treatment capacity from <br />the DSRSD RWTF. <br />Approximately 2.4 mgd of wastewater treatment capacity would be available for other reasonably <br />foreseeable projects within the City. Therefore, the proposed project, in conjunction with identified <br />cumulative projects in the City’s service area, would result in a less than significant cumulative <br />impact related to wastewater generation and wastewater treatment facilities. <br />Moreover, as discussed on page 3-3 in the DSRSD’s Wastewater Treatment & Biosolids Facilities <br />Master Plan, the most recent ADWF expansion project (Stage 4 Improvements Project) provided for <br />the ADWF capacity of 17 mgd mentioned above, as predicted by the previous DSRSD Master Plan.2 <br />Page 2-20 of the Wastewater Treatment & Biosolids Facilities Master Plan states that the projected <br />2035 influent Biological Oxygen Demand (BOD) and Total Suspended Solids (TSS) flows are less than <br />those that served as the basis for the Stage 4 Improvements Project design. Specifically, the <br />maximum daily load for BOD is 63,200 pounds per day less than what was previously projected and <br />the maximum daily load for TSS is 56,300 pounds per day less than the amount accounted for in the <br />previous ADWF expansion. Moreover, these projections were based on population estimates that <br />included the City. However, the City’s population has decreased compared to the population <br />projection since the creation of DSRSD’s Master Plan in 2017; from approximately 78,800 to <br />approximately 75,664; as noted on page 4-3 of the Draft EIR. As such, there would be capacity to <br />treat approximately 63,200 pounds per day of BOD and 56,300 pounds per day of TSS for the <br />development of the proposed project. <br />In relation to nutrients, agricultural uses are known to directly contribute to the amount of nutrients <br />in water.3 The current project site zoning district is Agriculture, with a portion of the project site <br />being mapped as grazing land. Development of the proposed project would result in the <br />construction of single-family residences and would not include any agricultural uses on the project <br />site. Additionally, DSRSD’s Raw Wastewater Diversion Project would produce recycled water to meet <br />the agency’s irrigation demand and was identified by the San Francisco Bay Regional Water Quality <br />Control Board to significantly reduce total inorganic nitrogen nutrient loads to the San Francisco <br />Bay.4 <br />As noted on page 3.15-16 of the Draft EIR, the proposed project would adhere to the City’s Water <br />Efficient Landscape Program, which requires implementation of outdoor irrigation water <br />conservation measures and practices. This is not anticipated to conflict with DSRSD’s Raw <br />Wastewater Diversion project. Given that agricultural uses are associated with the addition of <br />nutrients into receiving waters, the residential uses anticipated as part of the proposed project are <br />not likely to significantly increase nutrients in wastewater from the project site. This comment is <br /> <br />2 Dublin San Ramon Services District (DSRSD). Wastewater Treatment & Biosolids Facilities Master Plan. Website: <br />https://www.dsrsd.com/files/assets/waterservice/v/1/engineering/documents/master-plans/wastewater-treatment-and-biosolids- <br />facilities-master-plan-september-2017-final.pdf. Accessed February 6, 2026. <br />3 United States Geological Survey (USGS). Agriculture and the Quality of the Nation’s Waters. Website: <br />https://www.usgs.gov/mission-areas/water-resources/science/agriculture-and-quality-nations-waters#overview. Accessed February <br />6, 2026. <br />4 San Francisco Bay Regional Water Quality Control Board (San Francisco Bay RWQCB). Order R2-2024-0013 NPDES Permit <br />CA0038873. Website: https://www.waterboards.ca.gov/sanfranciscobay/board_decisions/adopted_orders/2024/R2-2024-0013.pdf. <br />Accessed February 6, 2026. <br /> <br /><br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.