Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Responses to Written Comments Final EIR <br /> <br /> <br />3-76 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec03-00 Responses to Written Comments.docx <br />established in the General Plan, Pedestrian and Bicycle Master Plan, and other transportation <br />studies. Study intersections for the proposed project were selected in consultation with City staff <br />and according to the City’s criteria. Measurements for existing conditions were taken during the <br />highest one-hour volumes during weekday morning and evening peak periods, when school was in <br />session, to account for typical traffic volumes in the proposed project area, which includes the <br />adjacent parcel APN 941-2600-1-3. <br />Page 24 of Appendix H states that all of the study intersections are operating acceptably at LOS D or <br />better during both the AM and PM peak-hours. Further, on page 7, the Transportation Impact Study <br />found that all study intersections would operate at acceptable LOS with implementation of the <br />proposed project, including the cumulative project scenario. <br />Seasonal cattle movements associated with ranch operations are intermittent and episodic in nature, <br />rather than a continuous or daily traffic generator. CEQA does not require that infrequent or <br />seasonal activities be separately quantified or disaggregated in the traffic baseline where they do <br />not materially affect average daily traffic volumes or operational performance of the roadway <br />network. The Draft EIR therefore appropriately relies on standard traffic engineering practice to <br />characterize baseline conditions. <br />With respect to proposed project impacts, the proposed project does not eliminate, restrict, or <br />physically block access to the Devany Parcel, nor does it propose changes that would interfere with <br />continued ranch operations or associated access. As discussed in Section 3.14, Transportation, the <br />proposed project would not result in inadequate access, unsafe roadway conditions, or conflicts <br />between project traffic and existing roadway users. Accordingly, no project-related impact to ranch <br />access or operations was identified. Similarly, the cumulative impacts analysis evaluates whether the <br />proposed project’s incremental contribution, when combined with other past, present, and <br />reasonably foreseeable projects, would result in a cumulatively significant transportation impact. <br />Because the proposed project does not substantially affect access to the Devany Parcel and does not <br />introduce traffic conditions that would conflict with existing agricultural uses, the absence of a <br />separate line-item analysis of Devany Parcel traffic does not render the cumulative analysis <br />inadequate. <br />Moreover, the discussion in Chapter 6, Alternatives to the Proposed Project, describes how existing <br />traffic to the proposed project site would remain if no development were to occur under Alternative <br />1 on Draft EIR page 6-11, as well as how by-right development under Alternative 2 would increase <br />vehicle trips from existing conditions on Draft EIR page 6-22. However, there is an existing significant <br />and unavoidable VMT impact in the project site area. As such, the required transportation impact is <br />discussed in Chapter 6, Alternatives to the Proposed Project. Furthermore, despite the significant <br />and unavoidable VMT impact, the proposed project would include VMT-reducing strategies such as <br />reducing off-street parking spaces and enhancing multimodal infrastructure, as stated on Draft EIR <br />page 3.14-13. The Alternatives analysis appropriately focuses on whether project alternatives would <br />reduce or avoid significant environmental impacts of the proposed project. Because the Draft EIR <br />does not identify a significant transportation impact related to Devany Parcel traffic under the <br />proposed project, CEQA does not require a separate alternatives analysis addressing that issue. <br />   <br /><br /> <br /> <br />