Laserfiche WebLink
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />22. The project developer shall complete the staging area and trail access prior to issuance <br />of occupancy of the 11th home in the subdivision. The project developer shall provide <br />bi-weekly check-ins with EBRPD staff prior to and during construction of the staging <br />area and trail. Project Specific Condition. <br /> <br />23. The project developer shall work directly with EBRPD staff to establish a long-term <br />funding mechanism to cover expenditures for maintenance of the staging area, trail, and <br />dedicated open space for fire, public safety, and operational needs. If a conservation <br />easement is required, the resource agencies will require an endowment be established <br />to provide for its long-term maintenance and stewardship of protected resources. The <br />funding mechanism shall be completed prior to issuance of building permits. Project <br />Specific Condition. <br /> <br />Environmental <br /> <br />24. MITIGATION MEASURES / IMPLEMENTATION MEASURES: As identified in the <br />project’s Environmental Impact Report (EIR), Findings of Fact (FOF), and Mitigation <br />Monitoring and Reporting Program (MMRP), implementation of mitigation measures is <br />required to reduce environmental impacts to the extent feasible. The adopted mitigation <br />measures applicable to the Project include, but are not limited to, those related to Air <br />Quality, Biological Resources, Cultural Resources, Geology/Soils, Hydrology/Water <br />Quality, Noise, Transportation, and Utilities. <br /> <br />All mitigation measures identified in the certified EIR and adopted MMRP shall be fully <br />implemented by the developer. These measures shall be incorporated into all applicable <br />improvement plans, grading plans, building plans, and construction documents, and <br />shall be subject to review and approval by the applicable City departments/divisions <br />prior to issuance of grading or building permits, as specified in the MMRP. <br /> <br />Ongoing Monitoring and Enforcement: All mitigation measures shall be monitored in <br />accordance with the adopted MMRP. The project developer shall be responsible for all <br />costs associated with implementation, monitoring, and reporting. The developer shall <br />create and provide a mitigation measures checklist indicating all mitigation measures <br />have been satisfied, incorporated into the building permit plans or improvements plans, <br />and/or addressed. Said checklist shall be incorporated as one of the first four plan <br />sheets of all building permit and engineering permit plan submittals for review by the <br />City prior to issuance of permits Compliance shall be verified by the City prior to <br />issuance of applicable permits and throughout construction and operation, as specified. <br />Project Specific Condition. <br /> <br />Green Building and Sustainability Measures <br /> <br />25. Climate Action Plan 2.0 Compliance: Prior to building permit issuance, a Greenhouse <br />Gas (GHG) Emission Compliance Checklist shall be provided, to the Planning Division <br />for review and approval by the Director of Community and Economic Development. The <br />measures shall be shown on the building permit plans submitted to the Building and <br />Safety Division. The Checklist shall include notation indicating the sheet(s) the measure <br />    <br />  <br /> <br />