Laserfiche WebLink
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />located at 3333 Busch Road. The project developer is responsible for all water costs <br />based on current billing rates. (Address this condition during construction) <br /> <br />72. ENCROACHMENT PERMIT: Any work performed within the City’s right-of-way, City <br />easements, or City-owned property shall be subject to an Encroachment Permit as <br />defined in Pleasanton Municipal Code Chapter 13.04. All encroachment permit work is <br />subject to adopted City of Pleasanton Standard Specifications and Details and shall be <br />performed by properly licensed contractors as determined by the City Engineer. Said <br />contractors must provide evidence of proper licensure, insurance and City-issued <br />Business License upon application for a permit. (Address this condition prior to permit <br />issuance) <br /> <br />73. HAUL ROUTE: Deliveries to and from the project site shall conform to the Commercial <br />Vehicle Regulations included in Pleasanton Municipal Code Chapter 11.48. Vehicles <br />with gross weights exceeding 3 tons but less than 8 tons are prohibited on any City <br />roadway other than those designated a Commercial Vehicle Route unless a <br />Transportation Permit has first been obtained. Said Commercial Vehicle Routes include <br />First Street, Stanley Boulevard, and Sunol Boulevard. In addition to weight restrictions, <br />vehicles that exceed 96 inches in width and/or 60 feet in length are also required to <br />obtain a Transportation Permit. For information about Transportation Permits call 925- <br />931-5677. (Address this condition prior to permit issuance) <br /> <br />74. CONSTRUCTION GENERAL PERMIT: This application is subject to a Construction <br />General Permit according to the National Pollutant Discharge Elimination System <br />(NPDES) General Permit No. CAS000002. The general permit is applicable to <br />development sites that disturb one or more acres of land surface. The project developer <br />will be required to register the project with the State Water Board’s Stormwater Multi- <br />Application and Report Tracking System (SMARTS) website. A Qualified Stormwater <br />Pollution Prevention Plan (SWPPP) Developer (QSD) and a Qualified SWPPP <br />Practitioner (QSP) must be responsible for permit compliance. The SMARTS system <br />will generate a Waste Dischargers Identification (WDID) number, which must be printed <br />on the grading and/or erosion control plans. (Address this condition prior to permit <br />issuance) <br /> <br />75. TEMPORARY TRAFFIC CONTROL: Work in the public right-of-way or publicly- <br />accessible easement areas require submittal, review, approval, and implementation of a <br />temporary traffic control plan. The plan shall be in writing and subject to review and <br />approval of the City’s Traffic Engineer. The plan must conform to the California Manual <br />on Uniform Traffic Control Devices (CA MUTCD), with specific emphasis on Part 6 <br />“Temporary Traffic Control”. If flaggers will be utilized, said personnel must be trained in <br />the proper fundamentals of flagging moving traffic before entering the right-of-way. The <br />City may demand to see evidence of said training before allowing said personnel into <br />the right-of-way. (Address this condition during construction) <br /> <br />    <br />  <br /> <br />