Laserfiche WebLink
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />115. TREE PROTECTION FENCING: Prior to issuance of a grading or building permit, the <br />project developer shall install temporary 6-foot-tall chain-link fencing (or other fence <br />type acceptable to the Landscape Architecture Division) outside of the existing tree drip <br />lines. The location of the tree protection fencing shall be shown on the demolition plans <br />(if applicable), grading, building, and/or landscape plans. The fencing shall remain in <br />place until final landscape inspection by the Landscape Architecture Division. Removal <br />of such fencing prior to approval may result in a “stop work order.” <br /> <br />OPERATIONS SERVICES DEPARTMENT – ENVIRONMENTAL SERVICES/UTILITIES <br />DIVISION – 925-931-5500 <br /> <br />116. SEWER LINE: The sewer line shall be private from the new manhole on (insert street <br />name) into the development. Prior to building permit submittal, the project plans shall be <br />revised to reflect this requirement. <br /> <br />117. BACKFLOW PREVENTION ASSEMBLIES: Backflow preventer assemblies shall be <br />designed and installed in accordance with current City Standards 704, 705, 706; State <br />Health and Safety Code; Title 17; and as required by the Director of Operations and <br />Water Utilities. All backflow preventer assemblies shall be tested and certified by a City <br />approved tester with the certification submitted to the City’s contractor, Aqua Backflow. <br />Testing will be performed at the time City water is turned on to the site. If an existing <br />backflow preventer is on the site it shall be tested and certified by an approved tester <br />with the certification submitted to the City’s contractor, Aqua Backflow, before project <br />water is drawn through it. An all-weather cover shall be placed over all backflow <br />prevention assemblies 4 inch and smaller. <br /> <br />118. RECYCLED WATER: Recycled water should be used on site during the grading and <br />construction period. However, under any declared stage of water shortage, recycled <br />water must be used throughout the grading and construction period. <br /> <br />TRAFFIC ENGINEERING DIVISION – 925-931-5677 <br /> <br />Traffic Control <br /> <br />119. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall <br />be submitted to the City Traffic Engineer for review and approval. Best management <br />practices to minimize traffic impacts shall be used during construction, including <br />scheduling of major truck trips and deliveries, to avoid peak travel hours. The TCP shall <br />have proper lane closure procedures such as flagger stations, signage, cones, and <br />other warning devices implemented during construction. The TCP shall also include <br />time of day/hours of lane closures and total number of days. <br /> <br />120. TRUCK ROUTES: The haul route for all materials to and from the project site shall be <br />reviewed and approved by the City Traffic Engineer prior to building permit issuance <br />and shall include the provision to monitor the street surfaces used for the haul route so <br />    <br />  <br /> <br />