My WebLink
|
Help
|
About
|
Sign Out
PC-2026-09
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:30:57 AM
Creation date
8/4/2026 8:30:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />that any damage and debris attributable to the haul trucks is identified and corrected at <br />the expense of the project developer. <br /> <br />121. TRAFFIC SIGNAGE AND STRIPING – ON SITE: All on site traffic related signage and <br />striping shall be included in the building permits plans for review and approval by the <br />City Traffic Engineer prior to building permit issuance. <br /> <br />122. TRAFFIC SIGNAGE AND STRIPING – OFF SITE: All off site traffic related signage and <br />striping shall be included in the improvement plans for review and approval by the <br />City Traffic Engineer prior to permit issuance. <br /> <br />123. TRAFFIC IMPACT FEES: The project developer shall pay any traffic impact fees for the <br />development as determined by the City Traffic Engineer through the Pre-Annexation <br />and Development Agreement. The fee shall be paid prior to building permit issuance. <br /> <br />124. DUBLIN CANYON ROAD: Prior to submittal of improvement plans to the City, the <br />Project Developer shall coordinate with the City’s Traffic and Engineering Divisions on <br />finalizing the roadway design for Dublin Canyon Road. The design shall include, but not <br />be limited to, lane configuration and striping along Dublin Canyon Road east of the <br />driveway of Lots 29 and 30 to the Greek Orthodox Church located at 11300 Dublin <br />Canyon Road (APN 941-2857-1) <br /> <br />In addition to the Dublin Canyon Road improvements required for the Project <br />Developer’s project, the Project Developer shall construct the roadway improvements <br />along Dublin Canyon Road east of the driveway of Lots 29 and 30 to the Greek <br />Orthodox Church. The Project Developer shall be reimbursed through the City’s Capital <br />Facilities Fee program for the reasonable and documented construction costs <br />associated with improvements constructed east of the driveway of Lots 29 and 30 to the <br />Greek Orthodox Church. The reimbursement amount shall be based on a cost estimate <br />prepared and submitted by the Project Developer and shall be subject to the review and <br />approval of the City Engineer prior to issuing permits. Project Specific Condition. <br /> <br />POLICE DEPARTMENT – 925-931-5144 <br /> <br />125. FLOCK CAMERA: The existing 1B Pole located along the project frontage of Dublin <br />Canyon Road shall be relocated in kind at the developer’s cost. Prior to submitting to <br />the City for permits, the developer shall work with Traffic Division and Police <br />Department staff regarding the timing of relocation and operation of the FLOCK camera. <br />The relocated pole details shall be included in the building and improvement plans for <br />review and approval by the City’s Traffic Engineer and Police Department prior to permit <br />issuance. Project Specific Condition. <br /> <br />END <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.