Laserfiche WebLink
PC-2026-16 June 24, 2026 <br /> <br />For free-standing streetlights on dedicated poles, the electricity shall be fed from <br />an unmetered secondary electrical circuit provided by PG&E. A photocell on <br />each fixture shall control operation of the lamp. Free-standing fixtures are subject <br />to PG&E’s LS2A “Customer-owned Street and Highway Lighting” rate schedule. <br />The applicant shall provide verification of total energy consumption of luminaire <br />to PG&E prior to connection. Billing for LS2A electricity consumption must be <br />transferred to the City upon acceptance of the streetlight installation. <br /> <br />Streetlights must have an electronic type photo control meeting ANSI standard <br />C136.10 with a turn on value of 1.0 foot-candles and a turn off value of 1.5 foot- <br />candles. Electro-mechanical or thermal type photo controls and not allowed. <br /> <br />Streetlights must have badge numbers on each pole. Badge numbers must be <br />affixed to the pole 9 feet from ground level facing the street-side and be legible <br />from the ground. <br /> <br />A streetlight wattage sticker needs to identify the actual total wattage consumed, <br />be visible from the ground, be of a size and type acceptable to PG&E showing <br />total fixture energy use in watts and must be installed on each fixture. (Fulfill this <br />condition prior to plan approval.) <br /> <br />61. CLEAN WATER PROGRAM (HYDROMODIFICATION PROJECTS): Because <br />the project creates and/or replaces more than 43,560 square feet (1.00 acre) of <br />impervious surface, increases impervious surface over pre-project conditions, <br />and is located in a susceptible area, it is considered a Hydromodification (HM) <br />Project according to Provision C.3.g of the Municipal Regional Stormwater <br />National Pollutant Discharge Elimination System (NPDES) Permit. Said permit <br />regulates stormwater runoff in Pleasanton. The Alameda Countywide Clean <br />Water Program developed a C.3 Guidance Manual to assist applicants in <br />addressing these regulations. The Guidance Manual is available for download at: <br /> <br />https://www.cleanwaterprogram.org/businesses/development.html <br /> <br />HM projects must include stormwater treatment measures in the site design to <br />cause no increase in the erosion potential of the receiving stream over the pre- <br />project (existing) condition. To demonstrate compliance, the City encourages use <br />of the Bay Area Hydraulic Model (BAHM). The model software can be <br />downloaded at no cost from Clear Creek Solutions. (Fulfill this condition prior to <br />plan approval) <br /> <br />62. OPERATION AND MAINTENANCE AGREEMENT: Regulated projects are <br />subject to a Stormwater Treatment Measure Maintenance Agreement between <br />the City and property owner to assure long-term maintenance of the installed <br />measures. The City will provide a template agreement. Once executed, the <br />        <br /><br /><br /><br />