Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 91 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />would not introduce a new mechanism for direct disturbance to aquatic habitat, shoreline vegetation, <br />or aquatic species. Therefore, consistent with the impact conclusions in the Prior FEIR, this option <br />would not increase the potential for impacts to sensitive habitats or special-status species and would <br />remain subject to all applicable water quality treatment and regulatory requirements as well as all <br />mitigation identified in the Prior FEIR. Accordingly, biological resource impacts would remain less than <br />significant and consistent with the conclusions of the Prior FEIR. <br />Mitigation Measures <br />MM BIO-1a Burrowing Owl <br />• To avoid potential impacts to active burrowing owl nests and adult owls, a qualified <br />Biologist shall conduct protocol-level burrowing owl surveys in accordance with <br />the California Department of Fish and Wildlife (CDFW) 2012 Staff Report. <br />• If an active nest is identified near a proposed work area and work cannot be <br />conducted outside of the nesting season (March 15 to September 1), a no-activity <br />zone will be established by a qualified Biologist. The no-activity zone shall be <br />large enough to avoid nest abandonment and shall, at a minimum, be a 250-feet <br />radius from the nest. <br />• If the burrowing owls are present at the site during the nonbreeding period, a <br />qualified Biologist shall establish a no-activity zone of at least 150 feet. <br />• If an effective no-activity zone cannot be established in either case, an <br />experienced burrowing owl Biologist shall develop a site-specific plan (i.e., a plan <br />that considers the type and extent of the proposed activity, the duration and timing <br />of the activity, the sensitive and habituation of the owls, and the dissimilarity of the <br />proposed activity with background activities) to minimize the potential to affect the <br />reproductive success of the owls. <br />MM BIO-1b Protection of Active Bird Nests (includes pre-construction survey and <br />implementation of avoidance buffer, if found). <br />1. Removal of trees shall be limited to only those necessary to construct the <br />proposed project as reflected in the relevant project approval documents. <br />2. If the proposed project requires vegetation to be removed during the nesting <br />season (February 1 to August 31), pre-construction surveys shall be conducted no <br />more than 7 days prior to the start of ground or vegetation disturbance (including <br />tree removal) to determine whether or not active nests are present. <br />3. If an active nest is located during pre-construction surveys, a qualified Biologist <br />shall determine an appropriately sized avoidance buffer based on the species and <br />anticipated disturbance level. (The California Department of Fish and Wildlife <br />[CDFW] recommends a minimum no-disturbance buffer of 250 feet around active <br />nests of non-listed bird species and a 500-foot no-disturbance buffer around <br />active nests of non-listed raptors.) A qualified Biologist shall delineate the <br />avoidance buffer using Environmentally Sensitive Area fencing, pin flags, and/or