Laserfiche WebLink
ARROYO LAGO RESIDENTIAL PROJECT <br />ADDENDUM <br /> <br /> <br />FCS 107 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480036/Addendum/21480036 Arroyo Lago Residential Project Addendum.docx <br />discussed in the Regulatory Framework of the Prior FEIR.34 The proposed project’s electricity <br />provider would also be required to meet the State’s future objective of 60 percent of in-State <br />electricity sales being generated from renewable energy sources by 2030. As such, the proposed <br />project would not conflict with or obstruct the applicable plan for renewable energy or energy <br />efficiency. Impacts would be less than significant. <br />Therefore, the proposed project would not introduce new significant impacts or create substantially <br />more severe significant impacts than those previously identified in the Prior FEIR. No additional <br />analysis is required. <br />Zone 7 Stormwater Option <br />The Zone 7 Stormwater Option would not result in any new or more severe impacts related to energy <br />use compared to those previously analyzed since it was previously considered in the Prior FEIR. <br />Under this option, construction of the detention basin, pump facilities, and storm drain force main <br />would be eliminated (as compared to the City Stormwater Option), thereby reducing construction- <br />related energy consumption associated with grading, equipment operation, and material transport. In <br />addition, the option would avoid the ongoing energy demand associated with the operation of pump <br />facilities. Accordingly, consistent with the impact conclusions in the Prior FEIR, the Zone 7 <br />Stormwater Option would not increase energy consumption or conflict with applicable energy <br />conservation plans, and energy impacts would remain less than significant and consistent with the <br />conclusions of the Prior FEIR. <br />Mitigation Measures <br />None. <br />Conclusion <br />There is no new information of substantial importance, changes in the project, or changes in <br />circumstances under which it will be undertaken, identifying new significant effects, nor is there a <br />substantial increase in the severity of previously identified significant impacts related to energy. The <br />conclusions from the Prior FEIR remain unchanged when considering the implementation of the <br />proposed project. No further environmental review is required. <br /> <br />34 Note that the percentages above do not reflect compliance with the Renewables Portfolio Standard (RPS), which <br />measures the use of tracking instruments called Renewable Energy Credits over the course of multi-year compliance <br />periods. Renewable Energy Credits that are purchased separately from the renewable energy can be used for RPS <br />compliance, but they do not factor into the power mixes or GHG emissions intensities above.